Ensure you have the correct version running!
If you don't see 26.19 in the bottom left corner, please clear your browser cache.
What's New - Table Of Contents
Timesheets
Open in a New Tab
Users logging time can now open a timesheet in a new browser tab directly from their work item, making it faster to reference or update time entries without losing their place.
Where and How:
Note: If your timesheet only has default crew hours (still requires employee entries) or the entries are not approved, they will not show in the Execution - Timesheets grid view!
Permissions:
System Admins will need to setup the Timesheet role permissions.
Details:
A button appears on both the IWP header and the task/execution task detail header (only when the user has time-logging permission).
Clicking the task button opens the individual timesheet in a new tab, current period, current user selected, with the task row present.
Clicking the IWP button opens the crew timesheet in a new tab, current period, IWP's crew selected, with the IWP row present.
Period matches the project's logging cadence (current week for weekly, today for daily).
An already-present task/IWP is not duplicated.
A timesheet is created when none exists for the current period.
An IWP with no crew assigned surfaces a "set a crew first" message instead of opening an empty crew timesheet.
Approve, Reject, Repeat
Superintendents can now approve, reject, and submit timesheets directly from both the cross-project and single-project timesheet grids, cutting down on navigation between views.
Where and How:
Example: Single Project Timesheet grid - multi select rows and click on the actions button (top right) and then select the action - such as 'Approve Selected'
Permissions:
System Admins will need to setup the Timesheet role permissions.
Details:
From each timesheet grid, a user can multi-select rows and approve, reject, or submit them via the header quick actions.
Actions are only offered/valid for Crew timesheets in an eligible status; ineligible selected rows are skipped and reported.
Rejecting shows an optional notes field, and the timesheet can be rejected with or without notes.
A partially failing bulk action processes all remaining rows and shows a success/failure summary.
The cross-project and single-project grids produce identical behavior for all three actions.
A user without timesheet approval permissions does not see or cannot use these actions.
On the cross-project grid, permissions are checked based on each row’s project; rows/actions the user lacks permission for are restricted accordingly.
The Big Picture
Supervisors gain a new cross-project grid view of timesheets and their line items, making it easier to oversee time tracking across multiple projects at once.
Where and How:
Access the 'Overview' O3 module / context menu, selected in the bottom left corner.
Then click on the Timesheet menu item for the grid.
You will notice you can access (where permitted to do so) timesheets across projects. Note this grid has a 'Project' column.
If you enter a timesheet from the area, you will be prompted for which project the timesheet entry pertains.
Details:
A user who is a member of multiple projects sees timesheets and line items from all of those projects in a single grid.
Each row shows a Project column identifying its source project.
Filters and columns behave the same as the existing project-level grids.
A user sees only data from projects they have access to, and view-only vs. editable state is correct per project.
Heads Up
Forepersons now receive a notification when one of their timesheets is rejected, so corrections can be made without delay.
Details:
Rejecting a timesheet as a superintendent generates a notification to the owning foreperson.
The notification contains the rejection reason/note and a working link to the rejected timesheet.A user with the notification setting enabled receives the notification via their chosen channel (in-app or email); a new user has the setting on by default.
Rejecting the same timesheet a second time produces a second, distinct notification.
No notification is sent to anyone other than the owning foreperson.
One Timesheet, Any Project
Users can now log timesheets that span multiple projects, letting staff track time without switching between project contexts.
Note: To enable individual timesheets (you will need project admin permissions), go to Project Settings - Timesheets option and under 'Individual Timesheets,' tick the 'Enable Individual Timesheets' option as shown below.
From the Overview module, select Timesheets.
Then click on 'Enter My Timesheet (Individual)' button.
Then click on the '+ Add New' button.
Details:
A PM can add a time line item on the Overview page and assign a project to each line item from the list of projects they have timesheet access to.
Summary and reporting views render correctly for cross-project time, matching the behavior of existing per-project timesheets.
A line item logged at the individual project level appears in the cross-project Overview timesheet, and vice versa, with no double-counting.
For a given person and period, the cross-project timesheet total equals the sum of that person's line items across their individual project timesheets for the same period.
Flag It
Superintendents can flag individual timesheet line items from the cross-project grid; submitting the timesheet then automatically moves it to rejected status, streamlining the correction workflow.
Where and How:
Superintendent opens the cross-project grid from the 'Overview' module.
Ensure the Timesheets grid view is set as 'Timesheet Line Items'!Selects one or more rows.
Click on the 'Action' button (vertical elipses) - from the menu - > "Flag Line Items"; optionally enters a reason.
A confirmation modal appears noting that confirming will reject the timesheet.
Superintendent confirms (commits the flag) or cancels (no change).
On confirm, each timesheet containing a flagged line moves to Rejected; flagged rows remain marked with their reasons.
More to Track
New fields added to timesheets, letting the client capture additional information relevant to their workflow.
Details:
A PM can set Discipline, Company, Shift, Shift Type, and Work Category on a timesheet line item, with values sourced from the correct lists.
The five new fields appear as configurable columns in the timesheet grid and can be shown, hidden, and reordered.
Contractor and Owner comment text fields are available in the existing approval flow, and entered text is stored and visible on the timesheet record.
Shift, Shift Type, and Work Category lookup values can be maintained at the project level.
Workface Planning and Progress
Run It Yourself
Project Administrators can now manually trigger the IWP Material Constraint Analysis at any time instead of waiting for a scheduled run. This gives teams more flexibility to check material constraints on demand.
Where and How:
Details:
A user with IWP entity settings edit permission sees the 'Run Now' button; a user without that permission does not.
Clicking 'Run Now' produces updated material constraint results equivalent to a scheduled run.
The button is unclickable for the duration of the run and becomes clickable again after it completes.
The scheduled analysis (if 'Schedule Material Constraints Analysis' option is enabled) still fires on its normal cadence after a manual run.
Button placement, styling, and completion feedback are consistent with the CWP material analysis run-now button.
Counting What's Left
Added Remaining Quantity and Actual Hours columns to the Weekly Work Plan Quantity View, giving planners more visibility into progress at a glance.
Where and How:
The weekly work plan is an IWP grid view. Switch to Quantity (toggle). The new fields are shown in the grid.
Details:
Remaining Quantity math is Total Units - Earned Quantity, and equals Total when nothing is earned.
Contacts
Say My Name
Contact information for tracked entities is now available as a report table, making it easier to build custom reports that include contact details.
Where and How:
Go to Report Templates under Project Settings. Click on the 'Template Fields'. Select the entity you are interested in (incl. User Defined Entity Types). Below the main entity fields, you can see the sub tables. One of these where applicable will show 'Contacts'.
You can use this as guide for incorporation into your report templates.
Click on the 'V' button to expand the Contacts fields.
Contacts for Everyone
The Contacts table now supports all entity types rather than a limited subset, giving users a consistent way to manage contact information across the system.
Where and How:
Go to Project Settings - Entity Settings - Select your desired entity. Then select the 'Contact Type' tab.
Team Boards and Actions
Filter Faster
Adds a quick filter for actions and expand/collapse-all controls to the entity board, helping users manage large boards more efficiently.
Where and How:
Open an entity board - switch to 'Card View' - then click on Open Actions / All Actions toggle button.
The expand and collapse button to show more or less card details.
Details:
The quick filter appears in the board's top-right toolbar with Open Actions / All Actions, and defaults to Open Actions on first load with no stored preference.
With All Actions selected, cards show completed actions below open ones, each showing name, completer, and completion date, visually distinct from open actions.
Both preferences survive a page reload and a new browser session, and carry over to a different entity board.
Expand All expands every card on the board and Collapse All collapses every card; a fresh board load applies whichever was chosen last.
With Expand All active, changing group-by, changing the entity type filter, and refreshing all leave the cards expanded.
Switching the quick filter while cards are expanded updates the visible lists without a manual re-expand.
Mine, Not Everyone's
Adds a "My {entity}" (e.g. My IWPs) quick filter button to entity grids, letting users quickly narrow lists down to items assigned to them.
Where and How:
Selecting an entity grid shows the toggle. Note all grid views might support the toggle button. For example 'All IWPs' does. Some Entities might have or have not an alternate grid view option/s.
Details:
The toggle button appears on contact-supporting entity grids with the entity-type-specific label (e.g. "My IWPs").
Toggling it on shows only entities where the current user is a contact (manual contact or package user field); toggling it off restores the full grid.
A user who is a contact via a package user field (e.g. Foreman) sees those entities when the filter is on.
Reloading or reopening the grid starts with the toggle off.
With the toggle on and no entities where the user is a contact, the grid shows empty.
Interface Agreements
Agreements, Documented
Adds reporting and document support for Interface Agreements, giving the client visibility into agreement status and related documentation directly in O3.
Where and How:
Go to Report Templates under Project Settings. Click on the 'Template Fields'. Select the 'Interface Agreements' report type. Once selected you can see the available main fields and sub tables available.
You can use this as guide for incorporation into your report templates.
Output can be produced as both Word (.docx) and PDF.
Integrations
Call Me By My Name
The Attachments API now accepts an entity name as an alternative to entity ID, giving integrators more flexibility when uploading attachments.
Where and How:
The API documentation can be accessed via the Profile button and clicking on the 'API documentation' menu item.
Locate Attachments and then POST sub section. From there you can see the 'Entity Name' option.
Details:
Existing entityId-based calls continue to succeed exactly as before.
A valid entityName-only request resolves to the correct entity and attaches successfully.
A request containing both entityId and entityName referencing the same record resolves successfully.
A request containing both entityId and entityName referencing different records returns a validation error.
A request with a non-matching entityName returns a clear error.
Model
Under the Hood
26.19 delivers several improvements to object optimization, including color extraction, optimization history tracking, bounding box fixes, and general performance gains for 3D model handling.
Scheduling
First Things First
Updates how shift successors are calculated so that date precedence is respected, improving accuracy of shift scheduling.
Rather than just Planned dates, the shift successors process now considers actual and forecast dates.
Where and How:
Shift successor can be seen via the Gantt View menu item. Select the Entity (e.g. IWP) and then click on 'Dependencies' button/toggle. The '-> Shift Successor' button is then presented.
After clicking on this, the process will run and provide a preview of the proposed movements in start and finish dates.
You can also access this feature from the IWP Lookahead menu item.
Details:
Shift Successors only works with the packages that are loaded in the gantt when you press the button. That's deliberate: a shift should never depend on packages you can't see on the view. The Planned gantt only loads packages with planned dates in the range.
Predecessor precedence resolves correctly in each case — Actual present; only Forecast present; only Planned present; only Baseline present; and none present (predecessor skipped).
A successor carrying an Actual date is not moved by Shift Successors.
A downstream successor of a locked (Actual) task is repositioned based on that locked task's driving date.
Shifted successors move only their Planned date, and final positions match the existing CPM output given the new driving date set.
With "Date By" set to any non-Planned basis (e.g. Forecast), the Shift Successors button is not shown; switching back to Planned restores it.
In a chain A → B → C where B carries a Forecast Finish: if A's slip pushes B's Planned Finish past B's Forecast, C is repositioned from B's shifted Planned Finish; if B's Forecast remains later than B's shifted Planned Finish, C is repositioned from B's Forecast. B's Forecast fields are unchanged in both cases.
UX and Onboarding
Inside the Lines
Adds borders to cards for improved visual clarity, and to make information easier to scan.
Details:
In the entity board card view, each card renders with a distinct border.
The action area within a card is visually separated from card content.
A card with multiple actions is clearly readable and each action is distinguishable.
A Fresh Coat
Updates the visual styling of the editor (such as form layouts) for a cleaner, more polished interface.
Details:
Editable fields sit flat at rest: a single straight underline aligned exactly with the label and column edge. On hover/focus the full rounded frame expands outward while the text stays put.
Read-only/disabled fields use a soft gray fill with a faint border — white box = editable, gray box = read-only.
State signaling: unsaved change = small yellow dot after the label; invalid = red frame (+ warning icon on text inputs) and the dot turns red.
Empty-state text (N/A, "Select an option", etc.) is a consistent placeholder gray.
Right-aligned controls (clear ×, calendar, chooser buttons) never move between idle and hover.
Example - State Signaling: Description has a yellow dot to indicate an unsaved changed.
Two Birds, One Modal
O3 now combines the Password Reset and Privacy Policy prompts into a single onboarding modal / prompt, simplifying the first-time setup experience for new users.






























