Ensure you have the correct version running!
If you don't see 26.12 in the bottom left corner, please clear your browser cache.
What's New - Table Of Contents
The Task At Hand
Administrators can now include Team Boards and Global Team Boards columns in execution task import spreadsheets.
Engineers and support staff can now log their own time directly in O3 using a new individual timesheet.
Time On the Road
Foremen can now create timesheets directly from the OnField mobile app.
You Want It On or Off?
Users can now toggle off component grouping by main component in the model (Tree) browser layout.
The fixed "6 weeks" Gantt chart filter has been replaced with a flexible "Weeks Ahead" numeric input.
All Systems Go
A new Systems Gantt chart is now available in the Gantt view menu, allowing commissioning managers to visualize system timelines directly in O3.
Project administrators can now configure a "Days from Planned Start Date" offset on Approval Types (Lead Time).
Tenants can now configure multiple SSO identity providers.
When a user assigned to exactly one contract creates an RFI or UDET, the contract is now automatically populated on the record.
A new Components view is now available in the TWP grid.
The "CWP Status" filter option is now available on the EWP Query Tile widget.
One List to Rule Them All!
Field users can now access all project drawings directly from the OnField home screen, without needing to navigate through an IWP.Entering progress on execution task steps in the mobile app is now much easier with a new quick-select form offering 0, 25, 50, 75, and 100% options.
Field crews can now view model groups in the OnField mobile app.
As Noted Under Timesheets!
Foremen can now create timesheets directly from the OnField mobile app.
Team Boards
The Task At Hand
Administrators can now include Team Boards and Global Team Boards columns in execution task import spreadsheets, allowing bulk assignment of team boards via upload. Any unrecognized board names are silently skipped, ensuring the import completes without errors even when some values don't match.
How To: You can see the import fields under Data Management - Data Requirements (or otherwise use search at top of screen) - for Entity Type - select 'Work Package Execution Tasks.' If you scroll down, you will then see two new entries; 'Team Boards' and 'Global Team Boards'.
Tip: You can use the Data Requirements to create an Import template. To add multiple entries, add a ',' comma between each Team Board name when importing.
Timesheet
It's My Own Time
Engineers and support staff can now log their own time directly in O3 using a new individual timesheet, selecting work packages (EWPs/DWPs), execution tasks, and daily hours without relying on manual spreadsheets. At the end of a period, users can also enter "to go" hours that are saved back to the execution task as forecast remaining hours.
How To: Project Admins would need to enable this feature in Project Settings - Timesheets. Then click on the Enable Individual Timesheets. You are then prompted to have time entered on a daily or weekly basis. Remember to Save Changes!
To Enable Individual Timesheets:
To Use:
The individual timesheet can be entered via Project Management - Timesheets. From the Timesheet dashboard, click on the 'Enter My timesheet (Individual).
You are then presented with the Timesheet entry form. This will default to the current period (can be changed). Then click on '+Add Row' button and enter the relevant information and hours.
Time On the Road
Foremen can now create timesheets directly from the OnField mobile app, entering crew members, hours, and work orders from the field without needing to return to a desktop. Timesheets created offline are saved locally and synced automatically when connectivity is restored, and supervisors can approve or reject submitted timesheets within the app.
To Do:
Open the OnField app. On the home screen you will now have an option for Timesheets (see below).
You can see a list of timesheets and use the search functionality.
Clicking on the '+' add button in top right on previous screen presents you wish the 'Timesheet Entry' form (as shown below). Select Crew, Foreperson, period and then add resources to the timesheet.
Example showing the addition of Timesheet Resources (e.g. crew members time booking) at the bottom of the screen.
When ready, click on the Submit button (shown below), or just save for now by clicking on the Save / disk icon in top right to save changes.
With the timesheet submitted, a timesheet approver can go in click on the tick (to approve) or cross to reject the timesheet.
Note:
If offline, you can save directly to your device. When back online, you can sync your locally saved data / timesheets with the central system, making it available to others to see.
The Timesheet button on the home page will indicate how many offline timesheets need to be synced.
The Sync button is shown on the main home page of OnField app.
Model
You Want It On or Off?
Users can now toggle off component grouping by main component in the browser layout, so CWAs, CWPs, and IWPs appear directly in the tree without requiring their main component to also be selected. This expands the existing piping grouping toggle to cover all component types.
How To: Open 3D Model. On Model Browser Tree (left panel), select 'Construction Components'. Then click on the Model Browser Configuration button (cog) and scroll down to 'Component Filter' section.
From here you will see the new option 'Group Components By Main Component'. Then to click on the 'Apply' button.
If enabled, you will see a hierarchy selection as below. If not enabled then you will get a flat list of construction components without the hierarchy.
Toggled ON (default behavior)
Toggled OFF (new behavior)
Gantt / Schedule
Full Steam Ahead
The fixed "6 weeks" Gantt chart filter has been replaced with a flexible "Weeks Ahead" numeric input, allowing users to define any custom planning horizon. The entered value is saved with the layout and restored automatically on reload.
How To: From a Gantt based output such as Gantt View or Project Gantt view, go to the 'Date Range' and from the drop down select 'Weeks Ahead'. After an adjacent input box is presented to enter the number of weeks you wish to see.
Enter the 'x' number of weeks you wish to see. In the example below, 6 is entered.
All Systems Go
A new Systems Gantt chart is now available in the Gantt view menu, allowing commissioning managers to visualize system timelines directly in O3 without relying on external tools. The chart supports the same interactions as other Gantt views, including drag-to-reschedule, click-to-open, and zoom controls.
How To: From the Workface Planning menu, select Gantt View (or otherwise locate via enter Gantt in the top search bar). From Entity Type Options panel on left, Systems is now an option.
Configuration
Lead By Example
Project administrators can now configure a "Days from Planned Start Date" offset on Approval Types (Lead Time), which automatically calculates and populates the due date when a new approval is created. An optional setting also keeps due dates continuously aligned with the parent's Planned Start Date whenever it changes, reducing the need for manual updates.
How To: Project Admins can edit the entity settings (of e.g. an IWP, EWP, etc.) and select 'Approval Types' tab. Open an existing entry, or add a new Approval Type by clicking on the '+' button.
You will see two new options. One to set the 'Days Before Planned Start' - to set a due date (for example we may need to approve a 'Ready for Construction' approval 14 days prior to construction / planned start) and to sync 'Keep Due Date aligned with Parent Planned Start Date.' So if enabled, if Planned Start date changes on the parent entity, it will adjust the approval due date accordingly.
Note: This functionality already exists on Constraint Types.
Now Everybody Wants to Login with Work Account!
Tenants can now configure multiple SSO identity providers, enabling organizations with separate employee and subcontractor domains to authenticate using their respective provider. A dropdown on the login page lets users select their SSO provider, with the last-used selection remembered for convenience.
Click here for the detailed Managing Multiple SSO providers setup guide.
Summary How To: With System Admins permissions, open User Admin and SOO Settings. Under SSO Settings, Click on 'Enable SSO Authentication'. If this is the only means to login (i.e. - don't want to utilize O3 User Name and Password), click on the 'Require SSO Authentication.' and Save Settings. Now add your SSO provider/s by first clicking on the '+Add SSO Provider' and proceed to add in your configuration details.
In this example, we have setup the SSOs so that the Owner (default) and a Contractor can use there respective login authentication processes to login without having to enter a user name and password.
See noted guide above for detailed configuration support.
Contract Convenience
When a user is assigned to exactly one contract and creates an RFI or UDET (User Defined Entity Type), the contract is now automatically populated on the record, eliminating the need to manually select it from the full list. This reduces friction for users who work exclusively within a single contract.
Note:
For Users assigned to one Project Team or multiple Project Teams: If those team/s only access the same single contract, this will be the user's default contract and this can be auto populated for the user. Otherwise a manual selection will need to be made.
This does not require 'Restrict data access by Contract and Project Team' general project setting to be enabled to work.
Data and Filters
More Love to the Test Work Packages
A new Components view is now available in the TWP grid, giving workface planners a consolidated view of all components assigned across their TWPs with full support for filtering, sorting, and exporting. This provides at-a-glance visibility without needing to open each TWP individually, matching the existing Components view available on IWPs.
How To: Open a TWP grid and at the top click on the Grid View and switch to 'Components'.
So How Many 'In Progress' EWPs Are There on Completed CWPs!
The "CWP Status" filter option is now available on the EWP Query Tile widget, giving users the ability to filter query results by CWP Status just as they can on similar widgets. This resolves a gap reported by Worley where the filter was missing from the tile's settings.
How To: Simply add or edit an existing 'EWP Query Tile' widget on a dashboard.
Go to the 'Filter' section and if you add a condition, the 'CWP Status' field is now a selectable option.
Mobile
One List to Rule Them All!
Field users can now access all project drawings directly from the OnField home screen without needing to navigate through an IWP.
The new Drawings entry point supports filtering by CWA, Discipline, and Status, works offline for previously downloaded drawings, and is backed by a configurable mobile layout that administrators can tailor per project.
How To: New Drawings entry point on OnField home page.
Click on this to see all accessible drawings without having to go into a specific entity first. You can use the filter at top.
Having opened a drawing, you set various attributes and also see attachments and view the main drawing. You can annotate and/or download drawing.
Mobile Progress
Entering progress on execution task steps in the mobile app is now much easier with a new quick-select form offering 0, 25, 50, 75, and 100% options, plus fine-grained +/- 1% controls. The old manual text input has been replaced entirely, reducing friction for field users entering partial progress.
Model Groupies
Field crews can now view model groups in the OnField mobile app, seeing multiple models combined into a single spatial view just as they appear in the O3 web application. This gives users a complete picture of layout, clearances, and connections directly from the field.
Added Model Groups as a viewable option after selecting Models on the home screen:
As Noted Under Timesheets!
Foremen can now create timesheets directly from the OnField mobile app.
Click on above link to jump to relevant notes.
Back to Top