Ensure you have the correct version running!
If you don't see 26.9 in the bottom left corner, please clear your browser cache.
What's New - Table Of Contents
Work Flows Better
Conditional Status Transitions: Automated status transitions can now be filtered by entity field values, giving administrators greater control over when transitions trigger automatically. This reduces unintended status changes and allows more precise workflow automation.Auditing has been added for entity status settings, providing administrators with a complete history of when and by whom status configurations were changed. This improves accountability and makes it easier to troubleshoot unexpected status behavior.
The default home view on Plot Plans has been adjusted to provide a better initial perspective when opening the module. Users will now see a more relevant and useful starting view that reduces the need to manually reposition the plan on each visit.
Users can now upload DWG files to Plot Plans and the system will automatically convert them to PDF format, simplifying document management for engineering drawings. This eliminates the need for manual conversion before uploading.
The AI Assistant can now provide grouped counts and summary statistics for major entity types, making it easier to get high-level data insights through natural language queries. Users can ask questions like 'How many open CWPs are there by status?' and receive structured summaries.
That Team Moved Me
A right-click context menu is now available on team boards, allowing users to quickly move tasks between sections without drag and drop. This improves usability, particularly for users who prefer keyboard and mouse navigation over drag-based interactions.Users can now more easily find and remove selected components from work packages, reducing the effort required to manage component assignments. Improved search and remove functionality makes work package editing faster and less error-prone.
Users can now drive their 4D visualizations using forecast dates rather than being limited to planned dates. This allows project teams to see a more realistic simulation of construction progress based on current forecasts.
You Can Hide If You Want To
A new 'Hide Not Implemented' toggle has been added to the Data Diagram view, allowing users to focus only on active and implemented elements. This declutters the diagram view and makes it easier to review current project data.It's Complete?
The Actions Timeline widget now supports an IsComplete filter configuration, allowing users to control whether completed actions are shown or hidden in their timeline view. This makes the widget more flexible and reduces clutter for teams focused on active work.Users can now shift successor tasks directly from the CWA Gantt chart, making it easier to adjust interdependent schedules without leaving the planning view. This reduces time spent on manual schedule updates and improves planning efficiency.
Project managers can now view CWAs, CWPs, EWPs, PWPs, and Systems together in a unified Gantt chart, providing a single consolidated schedule view across all work breakdown levels. This significantly improves cross-level planning and schedule coordination.
Construction Work Areas (CWAs) now display a critical path flag, giving project managers immediate visibility into which areas are on the critical path. This helps teams prioritize resources and focus on schedule-critical activities.
Workface planners can now view and export individual resource hour lines from timesheet rows and import the same data back into the system. This creates a full round-trip workflow for timesheet resource data, enabling offline review and bulk corrections.
Timesheet lines now support a cost code field at the individual line level, enabling more granular cost tracking and reporting for labour activities. This allows supervisors and project controls teams to allocate hours to specific cost codes with greater precision.
Administrators can now configure default lead times and durations for EWPs and PWPs relative to their parent CWP, standardizing scheduling defaults and reducing manual date-setting when creating new work packages.
Workface planners can now manage IWP constraints directly in the OnField app while working offline, ensuring critical planning activities are not blocked by connectivity limitations. Constraint data syncs automatically when the device reconnects.
Cost data from individual Work Orders now rolls up automatically through the WBS hierarchy, giving project controls teams a consolidated view of costs at each WBS level. This eliminates manual aggregation and improves financial reporting accuracy.
WBS hierarchy parent columns are now available in the Work Management column chooser, enabling users to display parent WBS context alongside work items. This improves visibility and traceability across the WBS structure.
I've Been Accepted
The 'Show Accepted' option is available in Data Review grid.
Work Flows Better
Conditional Status Transitions: Automated status transitions can now be filtered by entity field values, giving administrators greater control over when transitions trigger automatically. This reduces unintended status changes and allows more precise workflow automation.
How: Status Transitions are managed via the Project Settings (permissions required).
Go to Entity Settings and select an entity (e.g. CWP or IWP) and locate the Statuses tab. Then open the status you wish to edit. then go to the 'Allowed Transitions' tab.
With this update you can now have multiple 'Automatic' transitions. Using the filter we can put a condition in to match.
Notes:
Pre-conditions of the status you are moving to will be evaluated first and only if met (e.g. 100% Approved) will it then check the transition conditions (if set).
Status Transitions are processed in order (top to bottom) and the first auto status transition conditions met will move to that status. You can change the order by dragging the 3x3 dot icon to the left up or down.
Status transitions are only triggered by pre-condition criteria being updated, such as constraints or approvals completed, Progress is 100% Complete, etc. Updating a description only for example, does not trigger the transition.
Example:
In this example we have created two transitions from an 'Approved For Construction' status. Assuming the approval is made, if the package is already 100% complete it will move to the 'Completed' status. If that is not the case it will automatically move to 'In Progress.'
That's History!
Auditing has been added for entity status settings, providing administrators with a complete history of when and by whom status configurations were changed. This improves accountability and makes it easier to troubleshoot unexpected status behavior.
The status history can be located under Project Settings - Entity Settings - choose entity. Then, select statuses tab and open a status of interest. From there, select the 'History' tab and navigate the list.
Take Me Home!
The default home view on Plot Plans has been adjusted to provide a better initial perspective when opening the module. Users will now see a more relevant and useful starting view that reduces the need to manually reposition the plan on each visit.
When not set and in 'Plan View,' clicking on the 'Home View' will show the plot plan as when initially opened.
To set: Switch to 'Configuration View,' move to spot on plot plan and zoom in/out. When you have the desired return view (Home View), click on the 'Home View' button and you can then select 'Set Home View' option.
Now when you return to 'Plan View' and click on the 'Home View' button, it will show the plot plan as set.
I'm Converted!
Users can now upload DWG files to Plot Plans and the system will automatically convert them to PDF format, simplifying document management for engineering drawings. This eliminates the need for manual conversion before uploading.
We have also made improvements to resolution to make the DWG output is clearer.
Agent AI Reporting
The ai assistant is launched from the icon at the top of the screen.
Type in your question and see the results.
Updates in 26.9:
The AI Assistant can now provide grouped counts and summary statistics for major entity types (see above example), making it easier to get high-level data insights through natural language queries. Users can ask questions like 'How many open CWPs are there by status?' and receive structured summaries.
That Team Moved Me
A right-click context menu is now available on team boards, allowing users to quickly move tasks between sections without drag and drop. This improves usability, particularly for users who prefer keyboard and mouse navigation over drag-based interactions.
I Found You!
Users can now more easily find and remove selected components from work packages, reducing the effort required to manage component assignments. Improved search and remove functionality makes work package editing faster and less error-prone.
You can right click on a component and select 'Remove Component From Package.'
4D Forecasts
Users can now drive their 4D visualizations using forecast dates rather than being limited to planned dates. This allows project teams to see a more realistic simulation of construction progress based on current forecasts.
Select timeline based on 'Forecast Dates' to drive the 4D visualization.
You Can Hide If you Want To
A new 'Hide Not Implemented' toggle has been added to the Data Diagram view, allowing users to focus only on active and implemented elements. This declutters the diagram view and makes it easier to review current project data.
It's Complete?
The Actions Timeline widget now supports an 'IsComplete' filter configuration, allowing users to control whether completed actions are shown or hidden in their timeline view. This makes the widget more flexible and reduces clutter for teams focused on active work.
Let's Shift Gear
Users can now shift successor tasks directly from the CWA Gantt chart, making it easier to adjust interdependent schedules without leaving the planning view. This reduces time spent on manual schedule updates and improves planning efficiency.
Altogether Now...
Project managers can now view CWAs, CWPs, EWPs, PWPs, and Systems together in a unified Gantt chart, providing a single consolidated schedule view across all work breakdown levels. This significantly improves cross-level planning and schedule coordination.
Under Reporting, we have a new option for 'Project Gantt'. From here you can multi-select different entity types such as CWA, CWP, IWP, etc. on left side.
Note: This is currently a read only view.
What's Critical?
Construction Work Areas (CWAs) now display a critical path flag, giving project managers immediate visibility into which areas are on the critical path. This helps teams prioritize resources and focus on schedule-critical activities.
Example Critical Package Flagged with Red Star:
Time Please!
Continuing to expand O3's timesheet functionality...
Timesheet Line Items:
Workface planners can now view and export individual resource hour lines from timesheet rows and import the same data back into the system. This creates a full round-trip workflow for timesheet resource data, enabling offline review and bulk corrections.
We added a grid view - Timesheet Line Items. Providing a view of the Entry Date, Resource Name and Hours.
Exporting: You can now export using the export button.
Importing:
You can also import using the 'Timesheet Hours Summary' import type. The import file would be similar to shown on export timesheet line items grid. Also refer to the Data Requirements to view requirements.
Cost Codes:
Timesheet lines now support a cost code field at the individual line level, enabling more granular cost tracking and reporting for labor activities. This allows supervisors and project controls teams to allocate hours to specific cost codes with greater precision.
We'll Take The Lead
Administrators can now configure default lead times and durations for EWPs and PWPs relative to their parent CWP, standardizing scheduling defaults and reducing manual date-setting when creating new work packages.
The settings can be found via Project Settings - Entity Settings (EWP or PWP) and then see 'General Settings.'
PWP Settings:
The default Lead Time in days = Days before the CWP Planned Start Date, to set the Planned Finish date when creating from a CWP (also consider the Default Duration).
So for example, if we had a lead time of 20 days and the CWP planned start is May 30th, if the default duration is set as 6 days, the result would be:
The PWP Planned Finish will be 30th May minus 20 lead days = May 10th.
The PWP Planned Start is Planned Finish date minus 6 days duration = May 4th.
EWP Settings:
As PWP - EWP now also has the Default Lead and Duration and works in a similar way.
Usage:
Having established default offsets (lead days) from the CWP and duration:
When manually creating a PWP or EWP and after selecting the CWP (as long as CWP have planned dates), the default offset and duration can be applied as a starting planned date position.
When using the CWP Matrix to auto generate your packages for the CWA, you are now prompted to also add the EWP and PWP packages. This will also auto create the EWP and PWP (as chosen) predecessor constraints on the CWP.
Note: if using the CWP Matrix, to configure the CWP offset % and duration, this can be configured on, for example the the Discipline settings.
Back In the Field
Workface planners can now manage IWP constraints directly in the OnField app while working offline, ensuring critical planning activities are not blocked by connectivity limitations. Constraint data syncs automatically when the device reconnects.
Example: Open IWP and then open the constraints.
Constraints being edited offline (stored locally to the mobile device used), will show a notice at bottom to indicate the updates will be transferred and made live when back online and you have Sync'd the data.
Example: Being back online from the main OnField menu, we can sync our offline updates so that others can see the updates.
A Structured Approach
Cost data from individual Work Orders now rolls up automatically through the WBS hierarchy, giving project controls teams a consolidated view of costs at each WBS level. This eliminates manual aggregation and improves financial reporting accuracy.
Sample Data Overview:
Sample Data Zoomed In Structure:
Sample Data Zoomed In Cost Summary:
WBS hierarchy parent columns are now available in the Work Management column chooser, enabling users to display parent WBS context alongside work items. This improves visibility and traceability across the WBS structure.
I've Been Accepted
The 'Show Accepted' option is available in Data Review grid, via the Actions menu.
You can then use this view to see the changes on accepted entries.