Behind The Mask
Execution task names can now follow a configurable naming pattern.It's About Time!
Forepersons can now submit timesheets on behalf of their crew. Actual hours from these timesheets roll up to the relevant IWPs.Click & Go
Linked entity names on the Schedule Activities, Gantt and Outline View, grid views are now clickable links.Welcome emails now show which environment you're being invited to.
Project teams can now define standard template documents to be associated to new UDETs of a particular type.
You've Got Drive
Google Drive can now be connected and used as a document source in the platform.My TOP Widget
New Systems Skyline and TOP Skyline widgets are available on dashboards for tracking completion progress.CWPs can now inherit their parent CWA's boundaries for visualization.
Hooked On A Role
Access to webhook settings can now be restricted by role.User defined entity types now include two new flags; "Impacts Ready for Start Up" and "Requires Supplemental".
Work scope can now be inherited from UDETs to associated IWPs, including components, drawings, and attachments.
That's Rich!
Construction components now support additional attributes for richer project data.Requested For Integration - You Got It
RFIs (Request For Information) from Aconex can now be imported directly into O3.
Behind The Mask
Execution Task names can now follow a configurable naming pattern.
The mask will support:
{{IWP}}, {{EXE_TASK_TYPE}}, {{COMPONENT}}, {{CTR}} / {{CTR:N}} (counter with optional zero-padding).
For Example:
Mask: IWP-{{IWP}}-Task-C{{CTR:4}}
Output: IWP-F7123-Task-C0007
Where to Set-up the Mask?
You will need to be an admin or have project setting permissions.
Project Setup - Project Settings - Entity Settings - IWPs - Execution Task Type (tab) - Open an entry or add a new entry (+).
With the 'Execution Task Type' form open and scroll down to 'Name Mask.'
Tip: If your execution task types all have a mask setup, (admins) consider removing the 'Name' field from the new IWP Task form. If the Name field is available and a manual value is entered, this will be used (ignores mask name settings!).
It's About Time!
This new O3 function is literally about time! Forepersons can now submit timesheets on behalf of their crew. Actual hours from these timesheets roll up to the relevant IWPs.
How to Set-up:
You will need to be an admin or have project setting permissions.
Project Setup - Project Settings - Timesheet Settings.
Click on the 'Enable Crew Timesheets' so it is ticked.
With the option ticked, the project can decide if the timesheets are entered weekly or daily. Choose the option that suits requirements.
Remember to 'Save Changes'!
For menu access: Ensure Timesheets enabled under General settings!
Another consideration is Role Permissions: We have added a new role permission 'Timesheets,' such as view, update, delete, import and approve timesheets.
Entering and Reviewing Timesheets (Dashboard): From the Project Management, Timesheets menu option, you can open the Timesheets dashboard. Under 'Quick Actions you can add a new timesheet or review any existing.
If we add a timesheet, we can select the crew, foreperson (defaults to self), starting week (weekly timesheet setup). Then, click on '+ Add Resource.' Then, for e.g. the week, enter in the crew resources, IWP assignment and can state Activity, followed by the hours worked for the week.
You can repeat this for as many entries as required for the week (note you can also import timesheets!).
Save and Submit: When the timesheet is ready click on the 'Save' button. The 'Submit' button then appears. Click on this when ready to commit the timesheet.
Approve or Reject: Once a timesheet is submitted, the approve and reject options appear (for admins or where role permissions allow!).
Updated Timesheet Dashboard: Now we can see recent timesheets and launch the timesheets grid.
View Timesheets Grid: Clicking on the View all timesheets presents the Timesheets grid.
Lets approve our Timesheet. This entry was tied to IWP '001' and was for 5 hours. Switching to the IWP form layout, we can now see 5 'Actual' hours are now recorded against the IWP.
Click & Go
Linked entity names on the Schedule Activities, Gantt and Outline View, grid views are now clickable links.
The grid view can be switched with the button located just above Scheduled Activities grid (see below).
Example Hyperlinks in Schedule Activity:
Gantt View:
Outline View:
You're Welcome
Welcome emails now show which environment you're being invited to.
Example: This welcome email extract includes a web address/URL at the bottom and helps indicate which environment (O3 site) your account was created for. This can also be used if for some reason the button link does not work.
Go Team UDET
Project teams can now define standard template documents to be associated to new UDETs (User Defined Entity Types) of a particular type.
Note: Changes to the template configuration do not affect existing UDETs (e.g. a change order estimate form), only newly created ones, per the ticket scope.
How to Setup:
You will need to be an admin or have project setting permissions. Navigate to Project Setup - Project Settings - Entity Settings. Click on the UDET (example Change Order / CO created). Go to the 'General Settings' tab. Scroll down to the 'Auto Created Document Associations.' Click on the 'Add Document.' You can set a filter to reduce the document list. Tick the document/s you want to set as a default association.
Click on the 'Choose Items'.
Now the document/s will automatically be associated when new UDET is created.
How It Works: Add your new UDET. In the detail edit form layout, locate the 'Documents' tab and your auto created document association is created automatically.
You've Got Drive
Google Drive can now be connected and used as a document source in the platform out the box.
How to Setup:
You will need to be an admin or have project setting permissions.
Project Setup - Project Settings - Integrations.
Click on the '+' button.
From the 'Add Integration,' you can click on the 'Google Drive' option.
Once 'Google Drive' is selected you will be shown the 'Google Drive' integration form.
Enter the appropriate details and click on 'Save Changes.'
Notes: Google Drive document management integration option, follows the similar format as the existing SharePoint, BIM360, and Aconex integrations.
What's included:
OAuth 2.0 authorization flow: Users configure their Google Cloud Client ID and Client Secret, then authorize via a popup-based OAuth flow. The refresh token is stored so subsequent connections are automatic.
Shared Drive selection: After authorizing, users can browse and select a Google Shared Drive to connect to.
Full import support: Documents, drawings, 2D drawings, PCF files, and models can all be imported from Google Drive folders, including pagination for large folders and recursive subfolder expansion.
Integration configuration copy: When importing configuration from another project, Google Drive credentials (Client ID, Client Secret, Shared Drive) are copied but the refresh token is excluded. Each project must authorize independently.
Help article link: Configuration instructions linked from the setup panel. Click here also.
NOTE: you must be authorized to access the Shared Drive.
My TOP Widget
New Systems Skyline and TOP Skyline widgets are available on dashboards for tracking system completion and turnover progress.
There are lots of options to configure these new skyline widgets.
It Was Bound To Happen!
CWPs can now inherit their parent CWA's boundaries for visualization.
For example, say you want to use your plot plans to do status visualization at the CWP level across the entire site, but as part of this, you have hundreds of different CWAs on the project, and those hundreds of CWAS have hundreds of different CWPs.
It was previously a lot of work to go in and draw the initial CWA boundaries. It'd be even more work and even more inconvenient to be able to draw the CWP boundaries. So we have added in a new setting, so you can use the parent CWA boundaries for plot plan reporting.
How To Do:
Open a plot plan.
If not already, define your CWA boundaries in 'Configuration View' and link to appropriate CWA using the design tools at the top.
Switch to the 'Plan View'.
Change Display Mode to 'Work Package Status' and association Type as 'CWP'.
Click on the pallet for the 'Visualization' panel and the 'Use Parent CWA.
Boundaries for CWPs' option will be shown. Tick this.
Note: You can also apply Discipline and more detailed filtering below this.
Now, if your type is set to 'CWA,' you will see the overall CWA status visualization, but if you switch the type back to 'CWP,' the CWA boundary (shape) will be colored to show the status based on the CWPs belonging to that CWA, taking the least / earliest status in that set (i.e. if you have two CWPs and one is Complete and the other is 'In Development' then the earlier 'In Development' status legend would be shown for the CWA boundary).
Summary CWP Progress represented on the CWA boundary:
So as a check, we can see the properties of the CWA, showing the CWPs. We can see in this example, the lowest status is 'In Development' against 2 of the 3 CWPs on that CWA, which is used as the CWP Visualization on the CWA boundary.
..and if we want to see the CWA status visualization, choose Work Package Status, Type as CWA, Plan View and click on the pallet for the Visualization panel. In this example, the CWA is indicating the 'CWA - Open' status.
Hooked On A Role
Access to webhook settings can now be restricted by role permissions.
To Enable: A System Admin will need to modify or create a role permission against the 'Project Settings' permissions.
How To Do: Navigate to System Admin - User Admin - Roles - From roles Grid add (+) for a new role permission, or open an existing role. If editing an existing role entry, remember to click on the Action button and select Edit from the menu.
Remember to then 'Save Changes' once you have changed the option!
Permissions - Project Settings - Manage Web Hooks:
Raise The Flag
User defined entity types now include two new flags; "Impacts Ready for Start Up" and "Requires Supplemental".
Impacts Ready for Start Up:
Requires Supplementary:
I Inherited It
Work scope can now be inherited from UDETs to associated IWPs, including components, drawings, and attachments.
Usage Scenario:
We can use the UDET to define say a 'Work Request' for small works.
System Admin:
The UDET is set-up by the System Admin for the site, so it is an option to be used by projects on the O3 site/deployment (see System Admin menu - System - User Defined Entity Types).
Lets assume one is created called 'Work Requests' as our example.
Project Admins:
Make it available to the project: The Project Admin (or those with permission) can then enable the UDET (e.g. 'Work Requests') on the project (see Project Setup - Project Settings - General - General Settings - User Defined Entity Types (section) - locate the UDET (e.g. 'Work Requests') and tick to enable it for the project).
IWP Association Settings: With the UDET (e.g. 'Work Requests') enabled - set the IWP association settings as suits requirements (see Project Setup - Project Settings - Entity Settings - locate the UDET in the list (e.g. 'Work Requests') - General Settings (tab) and go to the 'UDET Settings' section).
From here you can select:
'Copy Components to Associated IWPs'
'Copy Drawings to Associated IWPs'
'Include Attachments in Associated IWP Reports'
In this case we have enabled all options:
Tip: At this point, you may want to consider creating a Mask for auto numbering such as WR-0001. See UDET 'General settings' (i.e. in same area as above) and locate 'Mask Settings' section and enter a mask like: WR-{{CTR:4}}
Ensure the 'Require Auto-Generation' is ticked. Remember to 'Save Changes'!
Associations Setup: We also need to enable the UDET as an association to the IWP and visa versa as suits the requirements/visibility (see Project Setup - Project Settings - Associations. For 'Choose an Entity Type to manage' - enter the UDET name (e.g. 'Work Requests'). Then locate IWPs below and tick enabled. To show the UDET from IWPs (form layout) - select IWPs at top and then the UDET (e.g. 'Work Requests') from the list below).
This shows making the IWPs as an enabled association for the UDET. Repeat and reverse to also make visible for the IWPs form layout.
Remember to 'Save Changes' at the top to commit!
In Use: Create your Work Requests (UDETs are normally visible under 'Project Management' menu, or can search from the top). Add your attachments, components and or drawings as required to the Work Request entry.
This example we have added an attachment to a new Work Request WR-0001.
On an IWP, we have added WR-001 as an association.
From the IWP, click on the Actions button and click on Generate Detail Report. You can see that the UDET (Work Request) associated attachment is now available to include in the report!
That's Rich!
Construction components now support additional attributes for richer project data.
Construction Contract [Documents & References]
Potential [Materials & Specifications]
Backfill Volume [Dimensions & Quantities]
Signal Type [Materials & Specifications]
These can be located under Data Requirements for the 'Construction Components' entity type.
Requested For Integration - You Got It
RFIs (Request For Information) from Aconex can now be imported directly into O3.
Integrations can be located via the Project Setup - Project Settings - Integrations. From the grid you can add new (+) and select Aconex - or edit an existing Aconex entry. From this form, you can see the new 'RFIs' tab option, where you can input your filters and settings, etc.