Ensure you have the correct version running!
If you don't see 26.6 in the bottom left corner, please clear your browser cache.
What's New - Table Of Contents
Let's not REST until we Connect Everything!
Exciting news! Our Integration functionality now supports configuration of REST API integrations directly in the UI. This makes it easier to automatically pull data from your favorite tools.Feeling Rejected?
We have a workflow for that. Approvals can now be routed directly when formally marked as 'Rejected', making it easier to track and communicate declined requests.Custom grid and form layouts can now be exported and imported between projects, so you don't have to recreate them from scratch.
It's All Shifted!
You can now manually push date changes from one IWP to it's linked successors, making it easier to update your schedule.Lets Raise The Bar!
The IWP Lookahead Gantt now shows planned hours alongside tasks, giving a clearer picture of upcoming workload.Hang On - Lets Get That Saved!
A warning now appears if you try to leave a task with an unsaved comment, preventing accidental loss of your work.When I Said It Was Finished...
Admins can now control who is allowed to un-claim progress on execution task steps, protecting the integrity of completed work.Mega Mind Expansion
The AI Assistant can now answer questions about your Bill of Materials and construction components.The AI Assistant chat now resets when you switch projects, so you always get answers relevant to the project you're working in.
Let's Jump On That One
Items mentioned in AI Assistant responses are now clickable, taking you directly to the relevant record.You can now copy values directly from the model tree, saving time when referencing or reusing model data.
We Got There In The End!
You can now export your full dashboard as a PDF that looks exactly as it does on screen — great for sharing with stakeholders.IWP report templates now include translation placeholders, making it faster to generate reports in multiple languages.
Filter Fantastic
Team Board Section can now be used to filter and group actions in Team Board widgets, making it easier to focus on specific areas of work.I Buy-In To That!
Procurement Work Packages (PWP) data is now captured automatically during model syncs, reducing the need to manually update it afterwards.We're In Sync
Components can now be automatically assigned to CWPs after a model sync, eliminating a time-consuming manual step.I've Split This Already
The system now prevents a component from being split more than once, avoiding data conflicts.Split components are now assigned sequence numbers, making them easier to identify and reference.
You can now delete split components you no longer need, completing the full lifecycle for managing component splits.
Split components now retain a reference to their parent, keeping your data traceable and organized.
Let's not REST until we Connect Everything!
Exciting news! Our O3 Integration functionality now supports REST API configuration directly in the UI. This allows you to easily pull data from your favorite tools directly into O3. You could also connect O3 to O3 for example!
A short guide on REST APIs is provided at the bottom of this section.
How To:
To add a Rest API integration, go to Project setup - Project Settings - Integrations - then click on the '+' button in top right.
From there, we now have a new interface. You can either click on the search bar or locate it, as shown in the example below.
Setup Example:
Enter a description of what the REST API is set-up for.
Connection Authentication Types Include: API Key, Basic Auth and OAuth2 (Client Credentials).
Example Connection (O3 to O3 in This Case):
Sync Tab where you can schedule the updates and run Post Sync Actions.
Actions Tab Example:
Multiple API actions can be added in the integration as long as they support the same connection settings!
Action Name: Whatever you wish to call it
Relative URL: End Point
Method: Get (currently available)
Import Type*: What area do you want to pull the data into (as referenced in Data Requirements)
Data Deliverable: You typically will need for mapping the source URL fields to the equivalent O3 fields.
*Import Type: For example we may want to extract Drawings list from the source URL end point into your project's O3 Drawings grid.
Task Example: This example would extract the task lists from another O3 site task list into the current project's task list grid.
What Else?
In the top right you can test or run an ad-hoc transfer by clicking on 'Run Manual Sync'.
Don't forget to 'Save Changes,' and if you want to copy your integration to or from say another project, the action button menu has import and export options.
What are Rest APIs?
A REST API (Representational State Transfer Application Programming Interface) is essentially a standardized way for different software applications to talk to each other over the internet.
Think of it like a waiter in a restaurant. You (the client) make a request, the waiter (the API) takes it to the kitchen (the server), and brings back what you asked for.
The basics of how it works:
REST APIs use standard HTTP methods to perform actions:
GET: fetch/read data
POST: create something new
PUT/PATCH: update existing data
DELETE: remove something
A simple real-world example:
When you check the weather on your phone, the app isn't storing all that weather data itself. It sends a GET request to a weather service's REST API, which sends back the current forecast in a structured format (usually JSON).
Why they're popular:
They're simple and use technology (HTTP) that already underpins the web.
They work across different languages and platforms.
They're stateless; each request is self-contained, making them scalable.
Virtually every major platform (Stripe, Slack, Google, etc.) offers one.
Feeling Rejected?
We have a workflow for that. Approvals can now be routed when formally marked as 'Rejected', making it easier to track and communicate declined requests, by going to a specific status post rejection.
Notes:
This is an optional workflow setting. To modify an Approval Type 'Rejected Status,' you will need to be an admin or granted project setting permissions.
To Do:
Project Setup, Project Settings, Entity Settings, select entity that supports approvals (e.g. IWP). Go To the Approval Types. Now open an existing approval type or click on + to add a new one.
Now on the Approval Types form layout, locate the 'Rejected Status' and enter a status to transition to, if the approval is rejected. Remember to save!
Example: On Approval being rejected we will jump to the 'Closed Out' status.
Custom Transfers
Custom grid and form layouts can now be exported and imported between projects, so you don't have to recreate them from scratch.
Notes:
To import / export project settings, you will need to be an admin or granted project setting permissions.
To Do:
Project Setup, Project Settings. At top right, there is the Export and Import Project Settings buttons. You will note that custom layouts are included within that transfer.
It's All Shifted!
You can now manually push date changes from one IWP to it's linked predecessors and successors, making it easier to update your schedule.
To Do:
The IWP Gantt view can be located by opening the IWP grid and changing the view to 'Gantt View.'
In the Gantt view, you can show 'Dependencies' to see the schedule logic / linking between IWPs.
In this example we can see some bars are clearly out of sequence..
How can we fix this?
You will see there is a '-> Shift Successor' button at the top of the Gantt screen.
Before committing date changes, O3 will show you what it intends to update to align with the schedule logic applied, comparing both the current dates and the new dates. Of course, those entries already completed will stay as actualized (skipped). It will also indicate how many days will be shifted.
If satisfied with the proposed changes, click on the 'Apply button' to proceed.
Example: Post updated shifted view
Note: Loop detection is checked and warned to the user.
Lets Raise The Bar!
The 'IWP Lookahead' Gantt now shows planned hours alongside tasks, giving a clearer picture of upcoming workload. Plus comparisons and warnings added.
The 'IWP Lookahead' option can be found within the 'Workface Planning' project menu.
You can change the hours type, which is displayed (like Estimate, Actual Remaining).
Hours are summarized at different group levels (like CWA, CWP, Discipline above IWP).
With the Estimated Hours option, you can also see the 'Planned vs Required' option.
This will provide a comparison on the bar, Planned Hours / Required Hours, side by side.
And we also added a warning to indicate if the IWP falls outside the CWP date range.
Hovering over the warning sign will reveal a tool tip explaining why there is a warning on the IWP.
Hang On - Lets Get That Saved!
A warning now appears if you try to leave a task with an unsaved comment, preventing accidental loss of your work.
Firstly the comment box sizes dynamically, meaning the tick and cross buttons will remain in sight better.
If you then navigate away with any unsaved comments, you will be prompted to save.
When I Said It Was Finished...
Admins can now control who is allowed to un-claim progress on execution task steps, protecting the integrity of completed work.
Notes:
To modify the setting to 'Restrict Unclaim Progress,' you will need to be an admin or granted project setting permissions.
To Do:
Part 1: Go to Project Setup, Project Settings, Entity Settings, IWP. Go To the General Settings tab. Under the IWP Settings section, toggle on/off the 'Restrict Unclaim Progress' as suits project requirements.
To Do:
Part 2: With the setting 'Restrict Unclaim Progress' ticked (turned on), the next stage is to define permissions that allow users to unclaim IWP progress.
To do this, you will need to be a System Admin to modify Role permissions. Open or create a Role via System Admin, User Admin and Roles. Open or add a new role from the grid. Locate the IWP section and enable / tick the 'Unclaim Progress' option to enable users with that role to unclaim progress on the IWP. Or otherwise, leave blank (not ticked) if role cannot unclaim progress.
To Do:
Part 3: Ensure users assigned with that role permission are / are not able to unclaim progress as appropriate.
TIP: To restrict this, consider a role just with the 'Unclaim Progress' ability enabled.
Allocate this to restricted list of persons/users. That way it can be easier to locate users with that role permission.
Users are prompted with ability to unclaim progress when they untick an execution task step 'Complete' as being incomplete. Note: admins have the ability to unclaim progress, regardless of the setting.
If the project has restricted unclaiming progress, and the user does not have the (role permission) ability to unclaim progress, the toggle to switch off 'Completed' will be disabled. You can however claim progress (tick complete).
Example: User cannot unclaim (untick the Complete toggle) progress:
Example: User can still claim complete / progress:
Mega Mind Expansion
The AI Assistant can now answer questions about your Bill of Materials (BOM) and Construction Components.
Let's Be Relevant
The AI Assistant chat now resets when you switch projects, so you always get answers relevant to the project you're working in.
Let's Jump On That One
Items mentioned in AI Assistant responses are now clickable, taking you directly to the relevant record.
Example: The returned entries have a hyperlink, which can quickly be accessed.
Copy That!
You can now copy values directly from the model tree, saving time when referencing or reusing model data.
Example: Hover over a CC and you will see the 'Copy' button made available.
Clipboard Paste:
S-6500
We Got There In The End!
We know this has been requested for a while, and the Print Dashboard offering was limited to a widget per page, but you can now use the 'Export To PDF' option to export your full dashboard as a PDF. It looks exactly as it does on screen, which is great for sharing with stakeholders and those that might not have O3 access.
Note: There are no page breaks generated. The PDF will be rendered as dashboard appears within O3.
I Liked The Old Format? The 'Print Dashboard' option is still available and works as before.
To launch: Click on the action button in top right of the dashboard. From that menu, click on the 'Export To PDF'.
Example Dashboard exported as a PDF.
Not - Lost In Translation
IWP report templates now include placeholders for automatic AI translation, making it faster to generate reports in multiple languages.
Perhaps you have sub contractors in the field that mainly speak a different language to the project office. How Is This Enabled?
Normally, on a report template you would just use the format #...#, where '...' is the field keyword, so O3 knows which field value to display.
Examples: #Description# or #Status#.
When creating a bi-lingual / translated reports, you can use the key word format #*...*#. The '*' informs O3 to translate the keyword, field value, into a different language. That language is defined on the Report Template entry in project settings.
Notes:
To modify the report template language, you will need to be an admin or granted project setting permissions.
To Do:
Part 1: Generate your Report Template in Word application. Use the #*...*# format where a translation will occur.
Example Report Template Extract (Intending to show the IWP description in English and Spanish):
IWP Description : #Description#
Descripción de IWP : #*Description*#
Part 2: Report Template Setting
Navigate to Project Setup, Project Settings and then Report Templates. Open or create a report template.
In the Report Template Details form layout, there is now the option to set 'Translation Language'.
Continuing our example, we have set the language on this (IWP based) report template to Spanish.
Part 3: Now Generating The Report
When we generate the report (Click on Generate Detail Report on the top right of the entity form layout):
Example Output Extract:
IWP Description : This is my package description
Descripción de IWP : Esta es la descripción de mi paquete
Filter Fantastic
The Team Board Section can now be used to filter and group actions in Team Board widgets, making it easier to focus on specific areas of work.
Example Team Board Widget with 'Section' utilized in grouping and filters.
I Buy-In To That!
Procurement Work Packages (PWP) data is now captured automatically during model syncs, reducing the need to manually update it afterwards.
So the PWP fields are added to the Construction Component (CC) grid and can be populated via the model parser integration or can also imported.
If the 'PWP Text' field is populated, O3 will display a corresponding PWP number if can be linked.
This works similarly to existing CWA and CWP fields approach..
Example PWP fields on CC grid:
We're In Sync
Components can now be automatically assigned to CWPs after a model sync, eliminating a time-consuming manual step.
When new model revisions were imported into O3, users had to previously, manually click "Automatically assign components to CWPs". This change automates this as a post sync function.
Specifically, we introduced a new "Auto-assign components to CWPs" option, which is now visible in the post sync actions configuration. When enabled, the auto-assignment runs automatically after each model sync completes.
The existing manual button on the CWP list page continues to work as before.
I've Split This Already
The system now prevents a component from being split more than once, avoiding data conflicts.
And There is More - On The Splits...
Split components are now assigned sequence numbers, making them easier to identify and reference.
You can now delete split components you no longer need, completing the full lifecycle for managing component splits.
Split components now retain a reference to their parent, keeping your data traceable and organized.
Quick Guide to Splitting Components
Before Component Split:
Select the CC:
On the model toolbar, there is a button (indicated below) to start the Split component:
What is X, Y and Z Axis?
If you look top down (view) the X represent the width and Y the depth. If you look side on then Z represents the height of the CC.
Taking Z axis as an example, you can say how many to split or select by distance:
To Split Distance, for example if there are 5 units then then O3 will split it 5 times. If split by number of splits, then it will be evenly split by the number specified.
You can also split on multiple axes at once.
Click on apply when ready.
Here we have split the CC into two sub components.
You can click on the split component from the model tree.
Note: You will need the model update permission to do the split!