Make sure you're using the correct version of O3! The version number is located in the bottom left corner!
If you don't see version number 25.23 in the bottom-left corner, please clear your browser's cache and refresh.
Note: If you cannot see a new feature - it may be because of your access permissions or the system / project administrators may not have enabled that menu option.
What's New - Table of Contents
To Be Or Not To Be?
Have you ever wanted to restore something you deleted? Well now its possible.I like to Move It Move It
You can now edit the entity dates from the 4D timeline view.Power To The Users
System admins can now grant additional permissions to make users more powerful.The Key to Updating
You will now be warned if your import file does not have the necessary update key.What Model?
You can now see which model the IWP is associated with in the grid.That's Quick
Quick Filters now extended to have Discipline and Purposes.A Cross Project
For Overview - cross project widgets have a widget category filter.The Big Picture
CWP dates are now shown on the add IWP form.That's Handy
You can now add a predecessor / successor on the Associations predecessor / successor grid with a prompt for which entity type you are adding.We're Aligned
When you output the Gantt Chart as a PDF, the timeframe is now aligned with the screen view.Delete, Delete...
You can now bulk delete constraints.The Project Has Landed
Additional Project Landing Page permissions have been added with the ability to edit the contact.Let's Put You In The Right Section
When adding a task to a team board with the popup form, you can specify which section you want to add the task to.Tree View
When you switch model tree views, O3 will maintain your previous selection when you re-open the model.Don't Lookup
Purchase Order Types can be managed via the Project Settings - Lookups option.That's Done
The ONField app now defaults to Completed Tasks - Off.Buying Power
You can now populate PWP (Procurement Work Packages) from EWPs.In Scope
'Construction Readiness Assessment' (CRA) dashboard template now sets the scope as Project and sets as the currently selected project.
To Be Or Not To Be?
Have you ever wanted to restore something you deleted? Well now its possible. This is available to Project Admins.
To Do: Under the Auditing menu there is now a 'Deleted Entries' option. This will list the main / primary entities (such as packages, RFIs, Systems, etc.). If you choose to restore an entity, O3 will also restore any deliverables, approvals, constraints, etc. that were connected (these are not listed in the grid to restore by themselves, as they need to be restored with their parent entity).
Select the row (click on it) and then click on the 'Restore' button in the top right of the screen.
Notes: If you have a new entity (package/RFI, etc.) that has the same Name/Package Number etc. as the deleted entity to be restored, you will not be able to restore it and an error will be shown. If you rename the new entry to something else (unique) then you can restore the deleted entity with its original name/unique reference. This ensures there are no duplicate entries.
I like to Move It Move It
You can now edit the entity dates from the 4D timeline view in the 3D Model.
You can hover over the start or end of a bar and click to drag this start/end point to the desired position on the Gantt chart.
You can then click on the 'Save Changes' button at the top to save.
You can also click and move the whole package bar, maintaining the bar duration, but moving the start and finish dates at the same time!
Note: you cannot override actual dates. For example, these lighter shade of green bars have actual dates.
This functionality is mainly to play through the model timeline and adjust the package dates for what works better with your current path of construction. For example, you may see something that is running out of sequence and needs to be adjusted while working through the model sequencing.
Power To The Users
System admins can now grant additional permissions to roles to allow users to edit specific Project Settings that otherwise would require a system or project admin to edit. This maybe useful when you have super users that need limited admin functionality.
For this release we have added Project Settings permissions to 'Manage Look-ups' and 'Manage Labels.'
Additionally, on IWP permissions, you can also allow Bulk Update Component Data.
The Key to Updating
You will now be warned if your import file does not have the necessary update key.
The Update Key can be found on the Data Requirements - Entity Name (as Import Type).
For example, the Associations import would expect 4 fields to be supplied so that it can determine exactly which record is being updated. Some, like packages entities, only require one update key (that is the unique package number).
What Model?
You can now see which model the IWP is associated with in the IWP grid. We have two new columns 'Preferred Model' and 'Preferred Model Group'. Where set, there is a hyperlink to allow you to quickly go to that model/model group.
This is set when an IWP is created from a model / model group or adding a component to an IWP from a model/model group.
That's Quick
Quick Filters now extended to have Discipline and Purposes and Look Ahead Views as options on the model tree quick filter.
A Cross Project
For the Overview module, cross project widgets have a widget category filter.
To access this, you need to select the Overview module (bottom left), click on Dashboard menu option, open or create a dashboard, click on '+' add button, select add widget, select 'Multi-Project' category and then those applicable widgets will be shown to the right.
The Big Picture
CWP dates are now shown on the add IWP form.
For example, we added an IWP and then selected the parent CWP number. The CWP Planned Start and Finish Dates are then displayed. This provides guidance for scheduling the IWP within that overall timeframe.
That's Handy
You can now add a predecessor / successor on the Associations tab - 'Predecessor/ Successors' grid.
To Do: For the example below, on the IWP form, open 'Associations' tab and go to the 'Predecessor/ Successors' grid. Click on '+' add button and select the entity type and indicate predecessor or successor. After you click OK, you will have a grid to select the entries to add.
We're Aligned
When you output the Gantt Chart as a PDF, the timeframe is now aligned with the screen view.
For example, if the 'Next 90 Days' are selected, the PDF will display from today through to 90 days from now.
Delete, Delete...
You can now bulk delete constraints.
To Do: Go to the Action Management menu option, Constraints, select the Entity Type for the constraint grid. Next, press shift and multi select constraint rows / records you want to bulk delete. Then click on the 'Delete' / trash can button in top right.
Then confirm or cancel the deletion when prompted.
The Project Has Landed
Additional 'Project Landing Page' permissions have been added, which means that other users can be granted the permission to maintain the project landing page.
Permissions include, Edit Project Image, Edit Announcements, Edit Quick Links and Edit Contact Information.
Let's Put You In The Right Section
When adding a new task to a team board with the pop-up form, you can specify which section you want to add the task to.
Tree View
When you switch model tree views, O3 will maintain your previous selection when you re-open the model. So, if you are using Engineering or Testing for example, go to another page in O3 and return to the model. That previous model tree view will be shown.
Don't Lookup
Purchase Order Types can be managed via the Project Settings - Lookups option.
That's Done
The ONField app now defaults to Completed Tasks - Off.
Buying Power
You can now populate PWP (Procurement Work Packages) from EWPs. This includes components, materials, drawings and documents.
To Do: On your PWP, select the EWP you want to link.
On Project Settings - Entity Settings - PWPs - under General Settings tab, PWP Settings - click (tick) on the option 'Compile PWP scope from EWPs.
The PWP will then pull in the EWP scope from the matching EWP selected on the PWP form layout.
In Scope
When you create a new dashboard, use the Create From Template option and the 'Construction Readiness Assessment' template will be shown. When selected, the
the dashboard scope will switch to Project and the Project to the current project selected.