Make sure you're using the correct version of O3! The version number is located in the bottom left corner!
If you don't see version number 25.21 in the bottom-left corner, please clear your browser's cache and refresh.
Table of Contents
Picture Perfect!
You can now add a photo to mobile and desktop RFIs (similar to the “Overall Model Shot” in the IWPs).Is that Month or Day?
When importing dates - O3 will use the meta data in Excel to decode which date is meant - such as distinguish between European dd/mm/yy and US mm/dd/yy.Lets Go Imperial
Inchdia and InchMeter columns added to CC.UDETs now get default statuses when created.
Model This
You can now raise RFIs from a 3D model.View to a CC
You can now set the view to components on the Systems grid.Do you know the Drill?
Cross Project dashboard widgets now drill down to grids (Project or Cross Project Grids).Document This
API endpoint for Project Users added.No Longer a Pane!
After selecting a status visualization from the 3D model, you are now taken to the visualization pane on the right hand side automatically.Its all in the Details
When exporting a grid, the filename now contains the name of my grid name, my layout name and time it was generated.What's Packaged?
When adding components non-graphically, you can now easily see which components have already been packaged on other packages.Lets Frame This Better
As a scaffold coordinator, I can now complete a scaffold request as "Cancelled" without assigning it to a scaffold.Get Notified
Drawing revision update notification with associated package list are now also sent to watchers as well as planner usersThat's More Configurable
Aconex Integration - additional configuration fields for user bound integration has been added.
Picture Perfect!
You can now add a photo to mobile and desktop RFIs
(similar to the “Overall Model Shot” in the IWPs).
If you cannot see the option - add 'Overview Model Shot' Field to your RFI form layout.
Is that Month or Day?
When importing dates - O3 will use the meta data in Excel to decode which date is meant - such as to distinguish between European dd/mm/yyyy and US mm/dd/yyyy.
Tip: For CSV (text) file type imports use dd-mmm-yyyy format.
Lets Go Imperial
Inchdia and InchMeter columns / fields have been added to Construction Components (CC) grid.
What's the Status?
Not sure where to start? User defined Entity Types (UDETs) now get default statuses added when created. Project admins can change these as required.
The status are: Open, In Progress, and Complete.
Example UDET called Preservation with default statuses:
Model This
You can now raise RFIs from a 3D model.
How To:
Open a model.
On the Association Type - select RFI.
Change Display Mode to Package Builder
Add RFI to select an existing one.
Select construction component/s from model to add to stagging area.
When ready click on the 'Add x stagged Components to Package'
Confirm selection - Click on continue button.
The Construction components are now added to the RFI.
Note if Materials is not shown as a tab on the RFI form layout - use system default or edit your custom form layout/s to add this option.
View to a CC
You can now set the view to components on the Systems grid.
Do you know the Drill?
Overview module - Cross Project Overview dashboard widgets will drill down to the selected bars data on the cross project Work Packages grid (e.g. IWP).
If the widget is set as project specific, it will drill down to the Project's relevant grid (e.g. Project 68 - IWP Grid) and filter accordingly.
Please note:
In order for users to be able to use Cross Project Grids - access should be enabled by the System administrators on the user's account page.
Document This
API endpoint for Project Users added.
No Longer a Pane!
After selecting a status visualization from the 3D model, you are now taken to the visualization pane on the right hand side automatically.
Also a convenient quick access button switches to Visualization pane view.
See to right of the Display Mode (see screen grab below)
Its all in the Details
When exporting a grid, the filename now contains the name of my grid name, my layout name, and time it was generated.
What's Packaged?
When adding components non-graphically, you can now easily see which components have already been packaged on other packages.
Lets Frame This Better
As a scaffold coordinator, I can now complete a scaffold request as "Cancelled" without assigning it to a scaffold.
Get Notified
Drawing revision update notification with associated package list are now also sent to watchers as well as planner users.
That's More Configurable
Aconex Integration - additional configuration fields for user bound integration has been added.