Table of Contents
Notes:
For a list of report keywords, please refer to the Appendix - Report Keywords and Table Keywords Reference
Example keywords are subject to change and/or omit new additions (fields/tables) introduced during regular software releases.
See Article: Report Templates - Using API to Get Keywords
to obtain field names for report template
The O3 reports are based on a normal (non template) Microsoft Word document and can be output as a Word document or PDF files.
When generating a report, only the PDF type output allows for selectable PDF attachments to be appended to the end of the report.
You will need appropriate account permissions to set up reports.
Links to Other Articles:
Overview:
A report template can be set up for various O3 package / entity types including,
EWP (Engineering Work Package), CWP (Construction), IWP (Installation), RFI (Request for Information), SWP (Scaffolding), TWP (Testing), Scaffolding Request Detail and Daily Report Detail and User Defined Entities.Report templates are created as Microsoft Word files. You format the template to suit your organization requirements (logos, font, structure/content...). They can be written or tabular (boxed) or combination of both in nature. If you already have a template, this can be a good starting point for the O3 report template and mapping the data fields.
To pull the column / fields of the entity, you surround the text (field name) with a # symbol in your Word template document. Also remove any spaces between multi-word field names. Common examples: #Name#, #Description#, #PlannerUser#.
Word Document - Example Extract Below
As grid column names can be different to the background system field name it is sometimes best to use the 'Data Requirements' reference section - where you can also select and download the field names of interest for the entity to report on (see: Data Requirements menu option - select entity to report on). Note there are some exceptions where the reported field name is different. Another means to find field names is using the API.
For some entities like IWPs, you may wish to include related sub items (Constraints, Documents, Drawing list, Approvals, etc.). To do this, you should create a Word table with one (top) row for your column headings (which do not have to align exactly to field names) and a row for your data (with each cell of that row having a '#' field you want to pull - example below).
* To inform the template where to pull the sub items, you need to go to the table properties within the Word template.
On the tab 'Alt Text' and against 'Title,' enter the sub item keyword (see Appendix for keywords). Ensure no spaces at end!
Note: In some cases the keyword tables (sub items) uses the entity fields, like Documents (as these have various attributes), in other cases O3 is using the Associations entity grid field names.
If the keyword is not present (as listed in appendix) but the data is associated, you can use keyword "associations: Associated Entity Type" to pull the data.
When your Word template is ready to try, you now need to set up a Report Template record in O3. To do so...
Go to Project - Project Settings - Report Templates menu and add an entry.
Give it a name, select the entity (e.g. IWP) the template it’s based on.
Upload your template Word file.Note: you can have multiple templates created per entity.
To generate the report, go to the entity grid, open an entry for the form layout. From the vertical ellipsis (3 dots) in the top right menu, select ‘Generate Detail Report’. See example below.
You can then select any available reports set up for that entity.
There are different delivery options, such as attach the output to the entity itself or to simply download it.
You can either generate the report as a Word document (default), which is useful for post editing / adding information not within O3, or you can generate a PDF.
The PDF is generally a locked document (there is a setting to fully lock the PDF on the Report template form), but O3 is able to attach any attachments in the PDF format (these can be selected). Which is an advantage over the Word output.
Tip: If both these abilities are required (post editing and PDF attachments), you could have one template to pull the O3 data fields and generate this as a Word document. You then have a second template that is generated as a PDF and mainly used to generate a document of attachments. When your Word document is ready, you can save as PDF and combine with the attachments PDF document (you may need PDF editing software to combine the PDF files).
Appendix - Report Keywords and Table Keywords Reference
Special Keywords
The following keywords are entries that are generally added to the source entity column / fields, such as calculated or special keywords for reporting purposes.
Keyword | Description | Example/s and Notes |
#Attachments: [[Attachment Type]]# | This is used to display a graphical attachment within the report. | #Attachments: Model Shot#
|
UOM – Naming - See below | Since BOM Data has different types, they are named as follows: |
|
Material Requirements/BOM |
|
|
#MaterialRequirementsUOM# | This would be the main / overall UOM for the BOM | Each, KG, Meters |
#LengthUOM# | Length UOM |
|
#HeightUOM# | Height UOM |
|
Execution Tasks |
|
|
#TaskUOM# | Use this name for UOM for Execution task tables |
|
Table Keywords
Related entities for the reported entity type, such as a table of IWPs related to the CWP being reported.
These are entered in the Word Template – Table Properties – Alt Text tab – Title box.
For the filterable tables, such as “associations: Associated Entity Type”, you would substitute the text after the colon with the noted field value. Example: “associations: Installation Work Package” to populate associated IWPs.
Table Keyword (Alt Text) | Description / Basis | Notes / Example Fields |
approvals | Entity Approval Grid. | #Name#, #ApprovedByUser#, #DateApproved# |
Approvals:approval type | Entity Approval Grid for a specific Approval Type. |
|
attachments | This will list the attachments related to the reported entity (as entity, attachments grid). | #Description#, #FileName#, #FileType# |
associations | Use this to report out all associations for the reported entity. | #AssociatedEntityName#, #AssociatedEntityDescription# |
associations: Associated Entity Type | This is as above but will allow you to filter for a specific linked entity. | For example, you may wish to just show the Mechanical Equipment linked to your IWP being reported. |
changehistory | Multi change history lines such as on RFIs.
| #EventName#, #ActionName#, #CreatedByUser#, #DateCreated#, #FieldName#, #OldValue#, #NewValue# |
comments | Multi comment lines such as on RFIs. | #CreatedByUser#, #DateCreated#, #Text# |
constraints
| This will report out all constraints. | #ConstraintID#, #ConstraintType#, #Constraint#, #Status# |
constraints: Constraint Type | This is as above but you can filter for a specific Constraint Type. | #ConstraintID#, #ConstraintType#, #Constraint#, #Status# |
construction-components | Report out the construction components of the package e.g. IWP. | #CompoentType#, #Description#, #TagNumber#, #Drawing# |
dailyReportEvents | Daily Report Events. | #EventCategory#, #Notes# |
dailyReportIWPs | This will report out related IWPs connected to the weather event. | #Name#, #IWPStatus# |
dailyReportNotices | Daily Report Notices: e.g. Notices To Comply | #FromCompany#, #ToCompany#, #Notes# |
dailyReportSafetyNotes | Daily Report Safety | #FromCompany#, #ToCompany#, #Notes# |
dailyReportWeather | Daily Report Weather
| #ObservationDateTime#, #TemperatureC#, #WeatherType# |
delays
| These are accessed via e.g. IWP – Execution Tab – Delays. | #DelayCode#, #DelayType#, #Notes#, #HoursLost#, #Status# |
deliverables
| Package deliverables. | #DeliverableID#, #DeliverableType#, #Deliverable#, #Status# |
development-checklist
| Checklists as shown under package Development – Checklist. | #Category#, #Name#, #Description# |
development-steps
| Development Steps - of the package e.g. IWP. | #Name#, #DevelopmentStepType#, #Status# |
documents
| Related Documents – uses the Document entity grid. | #Name#, #Description#, #Sheet#, #Revision#, #RevisionDate# |
documents: Document Type
| Documents grid but extracted for a specific document type. | Example “Documents:Ref & Std Dwg” |
drawings
| These are the package linked drawings. | #AssociatedEntityName#, #AssociatedEntityDescription# |
drawings: Drawing Type
| These are the package linked drawings extracted by the Drawing Type.
| #AssociatedEntityName#, #AssociatedEntityDescription# |
equipment
| This reports out the IWP – Resources – Equipment grid. | #ConstructionEquipmentType#, #Quantity#, #EstimatedDays# |
executiontasks | Reports out package execution task. | #Name#, #EstimatedHours#, #TotalUnits#, #TaskUOM# |
execution-task-steps | Reports out package execution task steps. | This entry will work a bit differently – not only will the steps be reported out but there will be a sub heading for the Task Type.
|
interfaces
| These are documents that were added to e.g. IWP – Documentation – Interfaces grid. | A similar approach could be taken if you have an interface document type – such as ‘Documents:Interface’ |
iwps
| This is mainly for CWPs where you need to report out the details of the IWPs connected. | This is using the IWP entity attributes (as an advantage over using the Associations:Installation Work Packages route) |
iwps:discipline | This is mainly for CWPs where you need to report out the details of the IWPs connected. This option allows you to report out by a Discipline. | This is using the IWP entity attributes (as an advantage over using the Associations:Installation Work Packages route)
|
manpower | This reports out the manpower grid – see e.g. IWP – Form Layout - Resources tab – Manpower option. | #ResourceType#, #Quantity#, #EstimatedDays# |
materialrequirements | This reports out the package Bill of Materials (BOM). | #CatalogCode#, #MaterialRequirementsUOM#, #Quantity# |
materialrequirements: Material Category | This reports out the package Bill of Materials (BOM) for a specific Catalog Code. | #CatalogCode#, #MaterialRequirementsUOM#, #Quantity#
|
mechanical-equipment
| Mechanical equipment as might be used in connection with a CWP. | #Name#, #Description#, #Status# |
open-constraints | This will report out open package constraints. | #ConstraintID#, #ConstraintType#, #Constraint#, #Status# |
open-constraints: Constraint Type | This will report out open package constraints by Constraint Type. | #ConstraintID#, #ConstraintType#, #Constraint#, #Status# |
permits
| These are documents that were added to e.g. IWP – Documentation – Permits grid. | A similar approach could be taken if you have a permit type, such as ‘Documents:Permits’ |
predecessors
| Similar to Successor this will report out the associations which are as a Predecessor entity. | #AssociatedEntityName#, #AssociatedEntityDescription#, #AssociatedEntityStatus# |
punchlist-items
| Punch List Items assigned against the e.g. IWP package. | #DisplayID#, #PunchlistItemType#, #Name#, #Status# |
purchase-orders
| Purchase Orders (POs) as they might be used in connection with a CWP. | #Name#, #Description#, #Status# |
qualitydocuments
| These are documents that were added to e.g. IWP – Documentation – Quality grid. | A similar approach could be taken if you have a quality document type – such as ‘Documents:QAQC’. |
safetydocuments
| These are documents that were added to e.g. IWP – Documentation – Safety grid.
| A similar approach could be taken if you have a safety document type – such as ‘Documents:Safety’. |
requisitions
| Material requisitions as might be used in connection with a CWP. | #Name#, #Description#, #PONumber#,
|
rfis
| These are RFI entries that are added to e.g. IWP – Documentation – RFIs grid. | This will report out as association attributes and not RFI entity. |
scaffold-requests
| These will be as the package – Resource – Scaffolding Requests grid. | For Request Number – use #DisplayID# |
siblings
| This table allows you to report out other IWPs that are related by having same parent CWP code. | This uses the IWP grid so use #Name#, #Description# etc. |
successors
| Similar to Predecessor, this will report out the associations which are as a Successor entity. | #AssociatedEntityName#, #AssociatedEntityDescription#, #AssociatedEntityStatus# |
tools | This reports out the Tools grid – see e.g. IWP – Form Layout - Resources tab – Tools option. | #ToolType#, #Quantity#, #EstimatedDays# |
Report Entity Fields (By Report Entity Type)
Reporting Entity Fields listed here.
The majority of reportable fields can be extracted from the ’Data Requirements’ grid within O3 for latest updates.
On the entity grids there are some inherited (such as parent CWP info on the child IWP, or an email address of a specific role on the entity) and also calculated entries. These tend to be requested and added on a case-by-case basis.
If you cannot get an entry to work, then please reach out to O3 support (support@O3.Solutions) or use the Intercom/online chat option within O3 for assistance.
Note: Entity field entries added to your report template should be surrounded with hash symbols and any spaces removed, e.g. ’#PlannerUser#
Reportable Entities Listed:
CWP (Construction Work Pack)
Daily Report (i.e. Weather Reporting)
EWP (Engineering Work Package)
IWP (Installation Work Package)
RFI (Request For Information)
Scaffold Request (As requested for work packages / xWP)
SWP (Scaffolding Work Packages)
TWP (Testing Work Package)
User Defined Entities can also be reported out.
Type Key:
Base – Entity fields
Calc – Calculated
Inherited – Obtained from a related entity
CWP Detail: |
|
|
Entity Field | Type | Example Report Template Entry (Note: there should be no spaces within the '#') |
CWP Number | Base | #Name# |
Construction Work Area | Base | #ConstructionWorkArea# |
CWP Status | Base | #Status# |
Description | Base | #Description# |
Discipline | Base | #Discipline# |
Discipline Description | Base | #DisciplineDescription# |
Area | Base | #Area# |
Contract | Base | #Contract# |
Planned Finish Date | Base | #PlannedFinishDate# |
Planned Start Date | Base | #PlannedStart Date# |
Planner User | Base | #PlannerUser# |
Purpose | Base | #Purpose# |
Unit | Base | #Unit# |
Actual Closeout Date | Base | #ActualCloseoutDate# |
Actual Cost | Base | #ActualCost# |
Actual Development Start Date | Base | #ActualDevelopmentStartDate# |
Actual Finish Date | Base | #ActualFinishDate# |
Actual Hours | Base | #ActualHours# |
Actual Issue Date | Base | #ActualIssueDate# |
Actual Start Date | Base | #ActualStartDate# |
Approved Date | Base | #ApprovedDate# |
Assembly Finish Date | Base | #AssemblyFinish Date# |
Assembly Start Date | Base | #AssemblyStartDate# |
Baseline Finish Date | Base | #BaselineFinishDate# |
Baseline Start Date | Base | #BaselineStartDate# |
Benchmark Notes | Base | #BenchmarkNotes# |
Budgeted Hours | Base | #BudgetedHours# |
Budgeted Earned Hours | Base | #BudgetedEarnedHours# |
Component Key Quantity | Base | #ComponentKeyQuantity# |
Component Key Quantity UOM | Base | #ComponentKeyQuantityUOM# |
Constructability Notes | Base | #ConstructabilityNotes# |
Construction Representative | Base | #ConstructionRepresentative# |
Construction Type | Base | #ConstructionType# |
Critical Path | Base | #CriticalPath# |
Critical Path Category | Base | #CriticalPathCategory# |
eCWP Sequence Number | Base | #CWPSequenceNumber# |
Date Approved For Construction | Base | #DateApprovedForConstruction# |
Date Delivered | Base | #DateDelivered# |
Date Released | Base | #DateReleased# |
Delivery Teams | Base | #DeliveryTeams# |
Design Area | Base | #DesignArea# |
Design Area Code | Base | #DesignAreaCode# |
Draft Review Date | Base | #DraftReviewDate# |
Early Finish Date | Base | #EarlyFinishDate# |
Early Start Date | Base | #EarlyStartDate# |
Earned Hours | Base | #EarnedHours# |
Estimated Cost | Base | #EstimatedCost# |
Estimated Hours | Base | #EstimatedHours# |
External Link | Base | #ExternalLink# |
External Link Verified | Base | #ExternalLinkVerified# |
External Link Verified By User | Base | #ExternalLinkVerifiedByUser# |
External Link Verified Date | Base | #ExternalLinkVerifiedDate# |
Forecast Finish Date | Base | #ForecastFinishDate# |
Forecast Release Date | Base | #ForecastReleaseDate# |
Forecast Start Date | Base | #ForecastStartDate# |
Forecasted Cost | Base | #ForecastedCost# |
Forecasted Hours | Base | #ForecastedHours# |
Has Released Version | Base | #HasReleasedVersion# |
Has Working Version | Base | #HasWorkingVersion# |
Interface Notes | Base | #InterfaceNotes# |
Is Current Working Version | Base | #IsCurrentWorkingVersion# |
Is Master Entity | Base | #IsMasterEntity# |
Is Previous Working Version | Base | #IsPreviousWorkingVersion# |
Key Quantity | Base | #KeyQuantity# |
Labels | Base | #Labels# |
Last Released Version Entity ID | Base | #LastReleasedVersionEntityID# |
Late Finish Date | Base | #LateFinishDate# |
Late Start Date | Base | #LateStartDate# |
Lead Engineer | Base | #LeadEngineer# |
Lead Engineer Email | Base | #LeadEngineerEmail# |
Lessons Learned Notes | Base | #LessonsLearnedNotes# |
Long Description | Base | #LongDescription# |
Master Entity ID | Base | #MasterEntityID# |
Material Destination | Base | #MaterialDestination# |
Module Handling Code | Base | #ModuleHandlingCode# |
Module Handling Description | Base | #ModuleHandlingDescription# |
Module Number | Base | #ModuleNumber# |
Planned Approved Date | Base | #PlannedApprovedDate# |
Planned Approved For Construction Date | Base | #PlannedApprovedFor ConstructionDate# |
Planned Closeout Date | Base | #PlannedCloseoutDate# |
Planned Development Start Date | Base | #Planned DevelopmentStartDate# |
Planned Issue Date | Base | #PlannedIssueDate# |
Planned Ready For Review Date | Base | #PlannedReadyForReviewDate# |
Planned Release Date | Base | #PlannedReleaseDate# |
Plot Plan Count | Base | #PlotPlanCount# |
Preferred Plot Plan | Base | #PreferredPlotPlan# |
Project Phase | Base | #ProjectPhase# |
Quality Notes | Base | #QualityNotes# |
Ready For Review Date | Base | #ReadyForReviewDate# |
Released By User | Base | #ReleasedByUser# |
Released Quantity | Base | #ReleasedQuantity# |
Released To User | Base | #ReleasedToUser# |
Revision | Base | #Revision# |
Revision Date | Base | #RevisionDate# |
Safety Notes | Base | #SafetyNotes# |
Schedule Activity ID | Base | #ScheduleActivityID# |
Schedule Data Date | Base | #ScheduleDataDate# |
Scope Exclusions | Base | #ScopeExclusions# |
Significant Requirements | Base | #SignificantRequirements# |
Source Deleted | Base | #SourceDeleted# |
Status Date | Base | #StatusDate# |
Technical Authorship Transfer Date | Base | #TechnicalAuthorshipTransferDate# |
Tie In Notes | Base | #TieInNotes# |
UOM | Base | #UOM# |
Vendor Notes | Base | #VendorNotes# |
Volume Type | Base | #VolumeType# |
Volume Type Code | Base | #VolumeTypeCode# |
WBS | Base | #WBS# |
Daily Reports Detail: |
|
|
Entity Field | Type | Example Report Template Entry (Note: there should be no spaces within the '#') |
Name | Base | #Name# |
Report Date | Base | #ReportDate# |
Company | Base | #Company# |
Observed By User | Base | #ObservedByUser# |
Created By User | Base | #CreatedByUser# |
Date Created | Base | #DateCreated# |
Modified By User | Base | #ModifiedByUser# |
Date Modified | Base | #DateModified# |
EWP Detail: |
|
|
Entity Field | Type | Example Report Template Entry (Note: there should be no spaces within the '#') |
EWP Number | Base | #Name# |
CWP | Base | #CWP# |
Description | Base | #Description# |
Discipline | Base | #Discipline# |
EWP Status | Base | #EWPStatus# |
Area | Base | #Area# |
Contract | Base | #Contract# |
CWA | Base | #ConstructionWorkArea# |
Engineer | Base | #EngineerUser# |
Planned Finish Date | Base | #PlannedFinishDate# |
Planned Start Date | Base | #PlannedStartDate# |
Planner User | Base | #PlannerUser# |
Purpose | Base | #Purpose# |
Unit | Base | #Unit# |
Actual Closeout Date | Base | #ActualCloseoutDate# |
Actual Development Start Date | Base | #ActualDevelopmentStartDate# |
Actual Finish Date | Base | #ActualFinishDate# |
Actual Hours | Base | #ActualHours# |
Actual Issue Date | Base | #ActualIssueDate# |
Actual Start Date | Base | #ActualStartDate# |
Annotated Drawings Count | Base | #AnnotatedDrawingsCount# |
Approved Date | Base | #ApprovedDate# |
Assembly Finish Date | Base | #AssemblyFinishDate# |
Assembly Start Date | Base | #AssemblyStartDate# |
Baseline Finish Date | Base | #BaselineFinishDate# |
Baseline Start Date | Base | #BaselineStartDate# |
Budgeted Hours | Base | #BudgetedHours# |
Company | Base | #Company# |
Critical Path | Base | #CriticalPath# |
Date Approved For Construction | Base | #DateApprovedForConstruction# |
Date Delivered | Base | #DateDelivered# |
Date Released | Base | #DateReleased# |
Draft Review Date | Base | #DraftReviewDate# |
Early Finish Date | Base | #EarlyFinishDate# |
Early Start Date | Base | #EarlyStartDate# |
Earned Hours | Base | #EarnedHours# |
Estimated Hours | Base | #EstimatedHours# |
External Link | Base | #ExternalLink# |
External Link Verified | Base | #ExternalLinkVerified# |
External Link Verified By User | Base | #ExternalLinkVerifiedByUser# |
External Link Verified Date | Base | #ExternalLinkVerifiedDate# |
Forecast Finish Date | Base | #ForecastFinishDate# |
Forecast Start Date | Base | #ForecastStartDate# |
Forecasted Hours | Base | #ForecastedHours# |
Labels | Base | #Labels# |
Late Finish Date | Base | #LateFinishDate# |
Late Start Date | Base | #LateStartDate# |
Long Description | Base | #LongDescription# |
Notes | Base | #Notes# |
Planned Approved Date | Base | #PlannedApprovedDate# |
Planned Approved For Construction Date | Base | #PlannedApprovedForConstructionDate# |
Planned Closeout Date | Base | #PlannedCloseoutDate# |
Planned Development Start Date | Base | #PlannedDevelopmentStartDate# |
Planned Issue Date | Base | #PlannedIssueDate# |
Planned Ready For Review Date | Base | #PlannedReadyForReviewDate# |
Plot Plan Count | Base | #PlotPlanCount# |
Ready For Review Date | Base | #ReadyForReviewDate# |
Released To User | Base | #ReleasedToUser# |
Remarks | Base | #Remarks# |
Revision | Base | #Revision# |
Revision Date | Base | #RevisionDate# |
Schedule Activity ID | Base | #ScheduleActivityID# |
Schedule Data Date | Base | #ScheduleDataDate# |
Scope Exclusions | Base | #ScopeExclusions# |
Significant Requirements | Base | #SignificantRequirements# |
Source Deleted | Base | #SourceDeleted# |
Status Date | Base | #StatusDate# |
IWP Detail: |
|
|
Entity Field | Type | Example Report Template Entry (Note: there should be no spaces within the '#') |
IWP Number | Base | #Name# |
Area | Base | #Area# |
Contract | Base | #Contract# |
CWP | Base | #CWP# |
Discipline | Base | #Discipline# |
DisciplineDescription | Base | #DisciplineDescription# |
Purpose | Base | #Purpose# |
CWA | Base | #ConstructionWorkArea# |
Description | Base | #Description# |
IWP Status | Base | #Status# |
Planned Finish Date | Base | #PlannedFinishDate# |
Planned Start Date | Base | #PlannedStartDate# |
Planner User | Base | #PlannerUser# |
Unit | Base | #Unit# |
Actual Closeout Date | Base | #ActualCloseoutDate# |
Actual Cost | Base | #ActualCost# |
Actual Development Start Date | Base | #ActualDevelopmentStartDate# |
Actual Finish Date | Base | #ActualFinishDate# |
Actual Hours | Base | #ActualHours# |
Actual Issue Date | Base | #ActualIssueDate# |
Actual Released To Quality Date | Base | #ActualReleasedToQualityDate# |
Actual Start Date | Base | #ActualStartDate# |
Alternate Foreman | Base | #AlternateForeman# |
Approved Date | Base | #ApprovedDate# |
Assembly Finish Date | Base | #AssemblyFinishDate# |
Assembly Start Date | Base | #AssemblyStartDate# |
Baseline Finish Date | Base | #BaselineFinishDate# |
Baseline Start Date | Base | #BaselineStartDate# |
Budgeted Hours | Base | #BudgetedHours# |
Company Supervisor | Base | #CompanySupervisor# |
Construction Equipment Notes | Base | #ConstructionEquipmentNotes# |
Contractor Supervisor | Base | #ContractorSupervisor# |
Crew | Base | #Crew# |
Crew Size | Base | #CrewSize# |
Critical Path | Base | #CriticalPath# |
Critical Path 2 | Base | #CriticalPath2# |
Critical Path Category | Base | #CriticalPathCategory# |
Date Approved For Construction | Base | #DateApprovedForConstruction# |
Date Delivered | Base | #DateDelivered# |
Date Released | Base | #DateReleased# |
Draft Review Date | Base | #DraftReviewDate# |
Early Finish Date | Base | #EarlyFinishDate# |
Early Start Date | Base | #EarlyStartDate# |
Earned Hours | Base | #EarnedHours# |
Estimated Cost | Base | #EstimatedCost# |
Estimated Hours | Base | #EstimatedHours# |
External Link | Base | #ExternalLink# |
External Link Verified | Base | #ExternalLinkVerified# |
External Link Verified By User | Base | #ExternalLinkVerifiedByUser# |
External Link Verified Date | Base | #ExternalLinkVerifiedDate# |
FCC Notes | Base | #FCCNotes# |
Forecast Cost | Base | #ForecastCost# |
Forecast Finish Date | Base | #ForecastFinishDate# |
Forecast Start Date | Base | #ForecastStartDate# |
Forecasted Hours | Base | #ForecastedHours# |
Foreman | Base | #Foreman# |
Foreman 2 | Base | #Foreman2# |
Foreman 3 | Base | #Foreman3# |
General Foreman | Base | #GeneralForeman# |
General Foreman 2 | Base | #GeneralForeman2# |
General Foreman 3 | Base | #GeneralForeman3# |
Hydrotest Type | Base | #HydrotestType# |
Insulation Type | Base | #InsulationType# |
Interfaces Notes | Base | #InterfacesNotes# |
IWP Filename | Base | #IWPFilename# |
IWP Late Finish Root Cause | Base | #LateFinishRootCause# |
IWP Late Start Root Cause | Base | #LateStartRootCause# |
IWP Sequence Number | Base | #IWPSequenceNumber# |
Key Quantity | Base | #KeyQuantity# |
Labels | Base | #Labels# |
Last Packaged Component Date | Base | #LastPackagedComponentDate# |
Late Finish Date | Base | #LateFinishDate# |
Late Start Date | Base | #LateStartDate# |
Lessons Learned Notes | Base | #LessonsLearnedNotes# |
Long Description | Base | #LongDescription# |
Paint Type | Base | #PaintType# |
Permit Issuer | Base | #PermitIssuer# |
Planned Approved Date | Base | #PlannedApprovedDate# |
Planned Approved For Construction Date | Base | #PlannedApprovedForConstructionDate# |
Planned Closeout Date | Base | #PlannedCloseoutDate# |
Planned Development Start Date | Base | #PlannedDevelopmentStartDate# |
Planned Issue Date | Base | #PlannedIssueDate# |
Planned Ready For Review Date | Base | #PlannedReadyForReviewDate# |
Planned Released To Quality Date | Base | #PlannedReleasedToQualityDate# |
Plant Operations Notes | Base | #PlantOperationsNotes# |
Plot Plan Count | Base | #PlotPlanCount# |
Prepared For | Base | #PreparedFor# |
Project Phase | Base | #ProjectPhase# |
Quality Notes | Base | #QualityNotes# |
Ready For Review Date | Base | #ReadyForReviewDate# |
Released To | Base | #ReleasedTo# |
Revision | Base | #Revision# |
Revision Date | Base | #RevisionDate# |
Rigging Location | Base | #RiggingLocation# |
Safety Notes | Base | #SafetyNotes# |
Scaffolding Required | Base | #ScaffoldingRequired# |
Schedule Activity | Base | #ScheduleActivity# |
Schedule Activity ID | Base | #ScheduleActivityID# |
Schedule Data Date | Base | #ScheduleDataDate# |
Scope Exclusions | Base | #ScopeExclusions# |
Significant Requirements | Base | #SignificantRequirements# |
Source | Base | #Source# |
Source Date Created | Base | #SourceDateCreated# |
Source Deleted | Base | #SourceDeleted# |
Special Notes | Base | #SpecialNotes# |
Specialty Contractor Notes | Base | #SpecialtyContractorNotes# |
Status Date | Base | #StatusDate# |
Sub CWP | Base | #SubCWP# |
Superintendent | Base | #Superintendent# |
Superintendent 2 | Base | #Superintendent2# |
Superintendent 3 | Base | #Superintendent3# |
System Required | Base | #SystemRequired# |
Task Code | Base | #TaskCode# |
Test Subsystem | Base | #TestSubsystem# |
Test System | Base | #TestSystem# |
Tool Notes | Base | #ToolNotes# |
Trade Coordination Notes | Base | #TradeCoordinationNotes# |
Turnover Subsystem | Base | #TurnoverSubsystem# |
Turnover System | Base | #TurnoverSystem# |
UOM | Base | #UOM# |
WBS | Base | #WBS# |
Work Condition | Base | #WorkCondition# |
Working Day Duration | Base | #WorkingDayDuration# |
RFI Detail: |
|
|
Entity Field | Type | Example Report Template Entry (Note: there should be no spaces within the '#') |
RFI Number | Base | #Name# |
Contract | Base | #Contract# |
Description | Base | #Description# |
Planned Finish Date | Base | #PlannedFinishDate# |
Planned Start Date | Base | #PlannedStartDate# |
RFI Status | Base | #Status# |
Actual Finish Date | Base | #ActualFinishDate# |
Actual Issue Date | Base | #ActualIssueDate# |
Actual Start Date | Base | #ActualStartDate# |
Approved Date | Base | #ApprovedDate# |
Area ID | Base | #AreaID# |
Commissioning Notes | Base | #CommissioningNotes# |
Company Contact User | Base | #CompanyContactUser# |
Company Recommendation | Base | #CompanyRecommendation# |
Contract Group | Base | #ContractGroup# |
Cost Impact | Base | #CostImpact# |
Disciplines | Base | #Disciplines# |
Document Revisions Required | Base | #DocumentRevisionsRequired# |
Drawing | Base | #Drawing# |
Engineering Response | Base | #EngineeringResponse# |
Final Recommendation | Base | #FinalRecommendation# |
Long Description | Base | #LongDescription# |
Notes | Base | #Notes# |
Opened By User | Base | #OpenedByUser# |
Operations Response | Base | #OperationsResponse# |
Planned Approved Date | Base | #PlannedApprovedDate# |
Planned Issue Date | Base | #PlannedIssueDate# |
Planned Ready For Review Date | Base | #PlannedReadyForReviewDate# |
Priority | Base | #Priority# |
Proposed Solution | Base | #ProposedSolution# |
Question | Base | #Question# |
Ready For Review Date | Base | #ReadyForReviewDate# |
Reason | Base | #Reason# |
Resolution | Base | #Resolution# |
Responsible Engineer User | Base | #ResponsibleEngineerUser# |
Revision | Base | #Revision# |
Revision Date | Base | #RevisionDate# |
RFI Type | Base | #RFIType# |
Schedule Impact | Base | #ScheduleImpact# |
Status Date | Base | #StatusDate# |
Subject | Base | #Subject# |
Unit | Base | #Unit# |
WBS | Base | #WBS# |
Work Impact | Base | #WorkImpact# |
Scaffolding Request Detail: |
|
|
Entity Field | Type | Example Report Template Entry (Note: there should be no spaces within the '#') |
Entity Name | Base | #EntityName# |
Entity Type | Base | #EntityType# |
Name | Base | #Name# |
Scaffold Request Type | Base | #RequestType# |
Assigned To User | Base | #AssignedToUser# |
Due Date | Base | #DateDue# |
Description | Base | #Description# |
Scaffold | Base | #Scaffold# |
Status | Base | #Status# |
Assigned By User | Base | #AssignedByUser# |
Assigned To Project Team | Base | #AssignedToProjectTeam# |
Assigned To Role | Base | #AssignedToRole# |
Assigned To User Group | Base | #AssignedToUserGroup# |
Company | Base | #Company# |
Completed By User | Base | #CompletedByUser# |
Contact User | Base | #ContactUser# |
Labels | Base | #Labels# |
Notes | Base | #Notes# |
Priority | Base | #Priority# |
SR Planned Start Date | Base | #SRPlannedStartDate# |
SWP Number | Base | #SWPNumber# |
SWP (Scaffolding Work Package) Detail: |
|
|
Entity Field | Type | Example Report Template Entry (Note: there should be no spaces within the '#') |
SWP Number | Base | #Name# |
Area | Base | #Area# |
Contract | Base | #Contract# |
CWA | Base | #ConstructionWorkArea# |
Description | Base | #Description# |
Planned Finish Date | Base | #PlannedFinishDate# |
Planned Start Date | Base | #PlannedStartDate# |
Planner User | Base | #PlannerUser# |
SWP Status | Base | #Status# |
Unit | Base | #Unit# |
Actual Closeout Date | Base | #ActualCloseoutDate# |
Actual Development Start Date | Base | #ActualDevelopmentStartDate# |
Actual Finish Date | Base | #ActualFinishDate# |
Actual Hours | Base | #ActualHours# |
Actual Issue Date | Base | #ActualIssueDate# |
Actual Released To Quality Date | Base | #ActualReleasedToQualityDate# |
Actual Start Date | Base | #ActualStartDate# |
Alternate Foreman | Base | #AlternateForeman# |
Approved Date | Base | #ApprovedDate# |
Assembly Finish Date | Base | #AssemblyFinishDate# |
Assembly Start Date | Base | #AssemblyStartDate# |
Baseline Finish Date | Base | #BaselineFinishDate# |
Baseline Start Date | Base | #BaselineStartDate# |
Budgeted Hours | Base | #BudgetedHours# |
Construction Type | Base | #ConstructionType# |
Date Approved For Construction | Base | #DateApprovedForConstruction# |
Date Released | Base | #DateReleased# |
Discipline | Base | #ScaffoldingWorkPackage Disciplines# |
Draft Review Date | Base | #DraftReviewDate# |
Earned Hours | Base | #EarnedHours# |
Estimated Hours | Base | #EstimatedHours# |
External Link | Base | #ExternalLink# |
External Link Verified | Base | #ExternalLinkVerified# |
External Link Verified By User | Base | #ExternalLinkVerifiedByUser# |
External Link Verified Date | Base | #ExternalLinkVerifiedDate# |
Forecast Finish Date | Base | #ForecastFinishDate# |
Forecast Start Date | Base | #ForecastStartDate# |
Forecasted Hours | Base | #ForecastedHours# |
Foreman | Base | #Foreman# |
Foreman 2 | Base | #Foreman2# |
Foreman 3 | Base | #Foreman3# |
General Foreman | Base | #GeneralForeman# |
Labels | Base | #Labels# |
Last Packaged Component Date | Base | #LastPackagedComponentDate# |
Long Description | Base | #LongDescription# |
Planned Approved Date | Base | #PlannedApprovedDate# |
Planned Approved For Construction Date | Base | #PlannedApprovedForConstructionDate# |
Planned Closeout Date | Base | #PlannedCloseoutDate# |
Planned Development Start Date | Base | #PlannedDevelopmentStartDate# |
Planned Ready For Review Date | Base | #PlannedReadyForReviewDate# |
Planned Released To Quality Date | Base | #PlannedReleasedToQualityDate# |
Ready For Review Date | Base | #ReadyForReviewDate# |
Revision | Base | #Revision# |
Revision Date | Base | #RevisionDate# |
Source Date Created | Base | #SourceDateCreated# |
Status Date | Base | #StatusDate# |
Superintendent | Base | #Superintendent# |
TWP (Testing) Detail |
|
|
Entity Field | Type | Example Report Template Entry (Note: there should be no spaces within the '#') |
TWP Number | Base | #Name# |
Area | Base | #Area# |
Contract | Base | #Contract# |
CWA | Base | #ConstructionWorkArea# |
Description | Base | #Description# |
Discipline | Base | #Discipline# |
Planned Finish Date | Base | #PlannedFinishDate# |
Planned Start Date | Base | #PlannedStartDate# |
Planner User | Base | #PlannerUser# |
Purpose | Base | #Purpose# |
Subsystem | Base | #Subsystem# |
System | Base | #System# |
TWP Status | Base | #Status# |
Unit | Base | #Unit# |
Actual Finish Date | Base | #ActualFinishDate# |
Actual Hours | Base | #ActualHours# |
Actual Issue Date | Base | #ActualIssueDate# |
Actual Mechanical Completion Date | Base | #ActualMechanicalCompletion Date# |
Actual Ready For Startup Date | Base | #ActualReadyForStartupDate# |
Actual Start Date | Base | #ActualStartDate# |
Assembly Finish Date | Base | #AssemblyFinishDate# |
Assembly Start Date | Base | #AssemblyStartDate# |
Baseline Finish Date | Base | #BaselineFinishDate# |
Baseline Start Date | Base | #BaselineStartDate# |
Budgeted Hours | Base | #BudgetedHours# |
Critical Path | Base | #CriticalPath# |
Critical Path Category | Base | #CriticalPathCategory# |
Date Delivered | Base | #DateDelivered# |
Date Released | Base | #DateReleased# |
Early Finish Date | Base | #EarlyFinishDate# |
Early Start Date | Base | #EarlyStartDate# |
Earned Hours | Base | #EarnedHours# |
Estimated Hours | Base | #EstimatedHours# |
Execution Plan Included | Base | #ExecutionPlanIncluded# |
External Link | Base | #ExternalLink# |
External Link Verified | Base | #ExternalLinkVerified# |
External Link Verified By User | Base | #ExternalLinkVerifiedByUser# |
External Link Verified Date | Base | #ExternalLinkVerifiedDate# |
Forecast Finish Date | Base | #ForecastFinishDate# |
Forecast Mechanical Completion Date | Base | #ForecastMechanicalCompletion Date# |
Forecast Ready For Startup Date | Base | #ForecastReadyForStartupDate# |
Forecast Start Date | Base | #ForecastStartDate# |
Forecasted Hours | Base | #ForecastedHours# |
Foreman User | Base | #Foreman# |
General Foreman User | Base | #GeneralForeman# |
Hydrotest Type | Base | #HydrotestType# |
Insulation Type | Base | #InsulationType# |
Key Quantity | Base | #KeyQuantity# |
Labels | Base | #Labels# |
Late Finish Date | Base | #LateFinishDate# |
Late Start Date | Base | #LateStartDate# |
Long Description | Base | #LongDescription# |
Notes | Base | #Notes# |
Operating Pressure | Base | #OperatingPressure# |
Packaging Status | Base | #PackagingStatus# |
Paint Type | Base | #PaintType# |
Parent Group | Base | #ParentGroup# |
Percent IWP Complete | Base | #PercentIWPComplete# |
Planned Issue Date | Base | #PlannedIssueDate# |
Planned Mechanical Completion Date | Base | #PlannedMechanicalCompletion Date# |
Planned Ready For Startup Date | Base | #PlannedReadyForStartupDate# |
Plot Plan Count | Base | #PlotPlanCount# |
Priority Group | Base | #PriorityGroup# |
Quality Notes | Base | #QualityNotes# |
Released To | Base | #ReleasedToUser# |
Revision | Base | #Revision# |
Safety Notes | Base | #SafetyNotes# |
Schedule Activity ID | Base | #ScheduleActivityID# |
Schedule Data Date | Base | #ScheduleDataDate# |
Source Deleted | Base | #SourceDeleted# |
Status Date | Base | #StatusDate# |
Superintendent User | Base | #SuperintendentUser# |
Test Medium | Base | #TestMedium# |
Test Pressure | Base | #TestPressure# |
Test Type | Base | #TestType# |
TWP Sequence Number | Base | #TWPSequenceNumber# |
UOM | Base | #UOM# |
Volume | Base | #Volume# |
WBS | Base | #WBS# |
Troubleshooting:
Table is not reporting correctly: If you have tables connected, sometimes Word can merge these and move the Alt Text table properties to the adjacent table. Ideally, try and have an air gap between the report tables and if they need to be close together, consider smallest font/row and have a slight gap.
Table keyword is not reporting out: Check there are no spaces before or following the entry #xxxx# in the table cell.
#keyword# is not converting to O3 value: This typically occurs when O3 does not recognize the keyword for the entity / package being reported out, so the keyword is ignored.
Table loses its first row: If your e.g. IWP report is set up so that you are reporting the main entity details in a table, check the table properties – Alt Text – Title. If this has a value such as Manpower, O3 will try and output that sub table and lose the header row. Simply clear the Title value to resolve.
Package #Description# appears different to the other entries (font size etc.): Description currently outputs with the underlying Word ‘Style’ such as Normal. So if you formatted the description as Arial font size 20, and your underlying style is Calibri size 8, it will appear as that. To work around this, you can create a new style that is at the desired settings.
Construction Components (CC) not reporting out: O3 does not currently support reporting out CCs on multi-version package entities.
UOM not reporting out: Some grid references are titled differently to distinguish themselves from other uses. Check the Special Keywords section for details. For UOM on material requirements, you could use #MaterialRequirementsUOM# instead, for example.