Skip to main content

Release Notes 25.8

Released April 16th, 2025

Written by Roy Abery

Important Announcement

Last year, we introduced a new menu hierarchy to better organize our navigation around phases of the project and key activities that our users perform. Thank you to everyone who tried this new menu hierarchy and provided overwhelmingly positive feedback.

As we look to add new areas to the application, it is time for us to start the process to remove the old menu hierarchy.

The old menu hierarchy will be removed from O3 in release 25.9 on April 30th.

If you have not done so already, please take this opportunity to swap to the new hierarchy. If you have the opportunity, please feel free to provide us with any final feedback (Article: New Navigation).

With this 25.8 release, you will see a change in appearance to the user interface with a user configurable dark/light theme background (replacing the blue/green background). ​The System Admin and Training, Overview and Project, 'Context' menu items are now accessed with a drop down list in bottom left corner of the screen. Continue reading these release notes for more details.

Thank you to all of our users! We look forward to working with you to continue to improve our O3 application throughout 2025.​

Best Regards

O3 Solutions Team​​

Now, back to the 25.8 Release Notes...


25.8 Release Notes​

Make Sure You're Using the Correct Version of O3! The version number is still located in the bottom left corner!

​

If you don't see version number 25.8 in the bottom-left corner, please clear your browser's cache and refresh O3.​​ Note: references to menu items assume that you are using the 'New Navigation' menu hierarchy structure. Please click here for more information. As noted above, we will be migrating permanently to the new menu structure on the next release.​


​Table Of Contents

Please use the Table of Content below to jump to a release topic.


Look and Feel

You will notice that the O3 user interface has now changed to a light/dark theme. The Context menu (e.g. System Admin) is now a drop down list in bottom left. The search box at the top of the screen has moved to the right side.

If you want to change to light or dark mode, click on the 'Profile' top right person icon and then 'Profile' menu option.​

On the profile form, you should see the 'User Settings'. From there, click on Theme and then indicate your preference of dark or light mode.

Once selected - click on the 'Save' button.

You have now switched the view to 'Dark' mode (see below) or 'Light' mode as above.​

The Context menu (where you would access System Admin, Training, Overview or the Projects menu items) is now a drop down list in bottom left corner. The current menu is selected. Click on this to reveal other options that you have access to! This change has freed some screen real estate.

​


It's Restricted

Project Teams can now be set-up as 'Is Restricted' and members can be set-up as 'Is Admin'. The admins of the project team can control who is able to be added or removed from the project team (in connection with Project Team - Role Permissions - see below).

To coincide with the above change, we now have a 'Project Teams' permission role with 'View Restricted'. Meaning if the Project Team is restricted (see above), a user with this permission role can see the Project Team. Notes: Both 'Is Admin' and 'Update' permission are needed. 'View Restricted' lets you see all the restricted teams. 'Update' lets you update the header of all that you can see, 'Is Admin' lets you add/remove members. So to add users to restricted teams, you need view, update, and admin.


You've Earned This

Earned quantities will now be calculated for IWP execution tasks and rolled up to their parent IWPs. The execution task Earned Quantity field will be 'Percent Complete' x 'Total Units'.

The Earned Quantity is also added to the parent work package/entity and will roll up the execution task earned quantity (where execution task UOM matches the key UOM of the package!)


Camera - Action

You can now auto grab model shots against the 4D Model over time.

From the Model, change view to '4D View' and change associated package type that can overlay the time based progress.

Next to the date range there is a new drop down button (to confirm, hover over this to show 'Automated Model Snapshot Export'). Click on this.

You can now define a gap between snapshots taken. So if daily select 1, weekly 7 days, etc. The gap between snapshots (default 5 seconds) is to enable the browser time to generate and refresh the model to reflect the next time period, before the screen grab is taken. If you have a very complicated model, you may need to increase the gap to find what works.

Some browsers may detect automated, multiple downloads (as a security feature) and prompt you to confirm it is OK/Allow. If not OK/Blocked, you may not have all snapshot files generated as expected.


Progress By Status

Drawing and Document statuses can now be used to drive the completion percentage on Drawings and Documents with estimated hours.

Note: if Execution Task Progress is active, O3 will use that data as a means to progress instead of status percentage and estimated hours.


Team Board - Board Section Names

Team board section names can now be edited from team boards. Simply click on the 'Pencil' icon adjacent to the Section heading you wish to edit.


Lost The Plot Plan

Plot Plan Filters - Save as Layouts

Want to not lose your filter views? Plot plan filters can now be saved as a layout to more easily support status visualization. See filter and Layout icon on Visualization panel (see below).

Constraint Status Visualization for Plot Plans is also a thing!

Plot plans now have a new 'Constraint Status' display mode.


Roll up material status to main components

Material status will now roll up from child components to main components to better support material status visualization. Since non-graphical CCs do not have their own graphic objects, filtering the model browser exclusively for non-graphical CCs to use them as scope objects for visualization will result in nothing being displayed in the scene. This is because the non-graphical CCs lack graphic representations.

To address this, we have ensured the Host Object’s graphic object remains visible in the scene for status visualization purposes.


CWP Budget Hours Summation in Schedule Mapping

Hours can now be summed from multiple activities when mapping schedules.


Ability to manipulate a date field in a data deliverable input

When importing data deliverables, users can now set offsets to dates.

See field mapping rule 'Adjust Date By...'


New 'EWP Documentation Completion Bar Chart' dashboard widget

The 'EWP Documentation Completion Bar Chart' is a new dashboard widget to status Drawings and or Documents against Engineering Work Packages (EWPs).

Notes:
EWPs need to have drawings or documents associated as scope children. The associations are required before this widget will display any results!
Use EWP scope relationships to drawings / documents and not general associations.
​
If a document or drawing is in a complete state it counts towards complete.
If a document or drawing is in an earlier state than complete, it counts as incomplete.
​
Due For Completion By Today = EWP Planned Start Date (PSD) < today's date.
​


​


Allow projects to 'automatically replace steel design data with fabrication data'

There is a new project setting available to replace Structural Steel engineering data with fabrication data as it is made available for each structure.

New Component Type - 'Steel Structure'

There is a new setting under Model Settings > General > ‘Automatically replace Steel design data with fabrication data’

When we see CCs of type ‘Steel Assembly’ appear with a Main Component of a ‘Steel Structure’

  • At the end of model parsing or CC import, if this is turned on...

    • Delete all ‘Steel Element’ CCs associated with ‘Steel Structure’ CCs that have >0 ‘Steel Assembly’ CCs

    • Update all CWPs that contain ‘Steel Structure' CCs and add all of their child ‘Steel Assembly' CCs

  • If you add an assembly to a structure (either a new CC or update ‘main component’ of an existing CC), we automatically add it to all packages that contain the structure.

    • If you add ‘Steel Structure’ to a CWP, go ahead and add all the child assemblies

  • We prevent creating new ‘Steel Element’ CCs for a ‘Steel Structure’ that has >0 assemblies

    • Add validation to the CC repository

    • Add validation to the model parsing bulk logic to exclude creating these


"Auto Create Component Drawing Associations as Predecessors" option for CWPs

Project administrators are able to turn on an "Auto Create Component Drawing Associations as Predecessors" option for CWPs (see entity settings) like they can already for IWPs.


"Auto Create Component Drawing Associations as Scope children" option for EWPs

Similar to the setting on IWPs, but instead of adding the associations as predecessors, the drawings will be added as scope children to the EWPs instead.


Material Summary View - At the IWP level

A new material status summary is available to roll up material data by catalog code. The worst case status is rolled up. If the Component itself has a separate status then the roll up will not occur.

Did this answer your question?