Skip to main content

Release Notes 25.7

Released April 2nd 2025.

Written by Roy Abery

Make Sure You're Using the Correct Version of O3!

​


If you don't see version number 25.7 in the bottom-left corner, clear your browser's cache and refresh O3.
​
​Note: references to menu items assume that you are using the 'New Navigation' menu structure.
​
​New Navigation: Please click here for more information.
​


​Table Of Contents

Please use the Table of Content below to jump to a release topic.

  • Spring Is In the Air
    Our first release of the spring brings a series of usability changes.

  • Was That Deleted?
    Users can now view and review components that were previously deleted in the data review tool.

  • By Default
    Users can now set default discipline drawings and/or documents for Engineering.

  • Work Management
    O3 is releasing our work management suite (WBS and Work Orders).

  • Put Pen to Paper
    O3 is swapping to a new annotation tool for drawing annotation.

  • When you create a new project you will be prompted to go directly afterwards to the Project Settings or proceed to the Project Details Form (as before).


Spring Is In The Air

Our first release of the spring brings a series of usability changes. Over the course of the next releases, the look and feel of the O3 application will be changing to improve the user experience. If you have any questions or feedback please reach out.
​
For this release we have made menu options 'Title' case rather than upper case (not soo loud!)
​


The Status and Progress grid visuals are more rounded and buttons less rounded, to differentiate more clearly between the two types.
​


Our dialogue message pop-up visuals have also been updated...
​


Was That Deleted?

Users can now view and review components that were previously deleted in the data review tool.

How: From the project navigation menu, select 'Data Management' option, then select 'Data Review' option. Just above the grid is a view selector for 'Pending Changes' (default) and 'Deleted Components'.


By Default

Project Admins can now set default drawings and documents against a discipline, for Engineering Work Packages (EWPs).
EWPs created within a given discipline will have the set drawings and/or documents associated upon creation.

How: Go to Project Setup - Project Settings - Disciplines. Open a discipline. You can then select EWP Drawings or EWP Documents and add the corresponding drawing or document you wish to automatically add to an EWP set-up using this same discipline.


Work Management

O3 is releasing our work management suite. Projects who are first getting started with digital work planning, or are looking for a first step into AWP can configure a flexible work breakdown structure and create work orders to plan their work without AWP terminology. If you know of a project interested in Work Management, please reach out to us.


When new projects are created, you now have the option to set them up as a 'Work Management' based project. This will then be based on the WBS (Work Breakdown Structure) and Work Orders (consider as distinct packages of work that are attached to the WBS, i.e. where the work will occur, such as Area 51 - Electrical - Sub Station - Install HV Cable).
​

You will now have a default WBS to start with, with Area, Discipline and Activity. This can be changed to suit project requirements.
You may want to change the name/s, amount of levels and or level order before you lock down (see 'Lock Hierarchy' button) the structure to populate the values on each WBS level and then attach 'Work Orders'/physical work packages to the structure.

When ready, you can lock down the WBS structure. Just click on the Lock Hierarchy button.

If you need more information on Work Management, please reach out.


Put Pen to Paper

O3 is swapping to a new annotation tool for drawing annotations. This tool has a slightly different user interface with similar functionality. Users can annotate drawings with shapes, text, and images to provide relevant context.
​


That's Convenient

When you create a new project you now will be prompted to go directly afterwards to the Project Settings or 'No, cancel' if you want to proceed to the Project Details Form (as before).


​


Did this answer your question?