Make Sure You're Using the Correct Version of O3!
If you don't see version number 25.6 in the bottom-left corner, clear your browser's cache and refresh O3.
Note: references to menu items assume that you are using the 'New Navigation' menu structure.
New Navigation: Please click here for more information.
Table Of Contents
Please use the Table of Content below to jump to a release topic.
Redecorating
We have started to adjust the O3 user interface to align with our rebranding and to provide a better user experience within the application.The Full Picture
The Schedule Gantt View will now default to the full schedule duration instead of the next 90 days.Skyline Widget - Report By Package
Skyline widgets can now be used to report on individual packages within a given category. This enables you to see the related packages stacked and labeled within the applicable bar!You can now view your schedule in an expandable hierarchy (grid grouping).
O3’s mobile responsive RFI solution for smartphones has been updated with larger buttons for easier use in the field, especially when using gloves!
Reporting Execution
We have introduced a new IWP report table to summarize the execution task types included in the IWP and their steps, and weighting. This can be used as a legend.You Need It When?
RFIs now have a dedicated “Response Required by Date” so you can let them know when you need a response by.That's Progress
“Drawing Completion Curve” and “Document Completion Curve” widgets are now available to report on drawing and document completion even if estimated and earned hours are not provided.With a SharePoint/BIM 360 integration, you can now map to the parent folder, rather than to every individual folder for sync and file processing.
“Execution Task Planned Start Date” is now available on the Execution Tasks Step grid.
The “Type” field is now available for User Defined Entity Types - dashboard reporting - Bar Chart Widget.
What's the Holdup!
O3 can now automatically create constraints for IWP Documents with Open RFIs.You can now embed Power BI reports within O3 dashboards using the new Power BI widget.
Development Steps are now available on Design Work Packages (DWPs).
A mobile responsive web interface for smartphones is now available for Punchlist Items.
Bay, Bank, and Level are now available in the Bill of Materials and Work Package Material Requirements.
Forecast Arrival Date (ETA) and Required at Site Date (RAS) are now available as fields on the Bill of Materials. These fields can be used at the CWP level to create a constraint for each CWP with material that is Forecast to arrive late against the RAS date.
Project Setting - Transfers
Its now easier to transfer the Project settings both within a deployment and across deployments (such as from Test to Production).You Don't have to Count On the Counter
Naming masks can now generate without a counter.
Redecorating
We have started to adjust the O3 user interface to align with our rebranding (such as colors used, font changes and updated logo) and to provide a better user experience within the application. You probably noticed when you logged into O3!
The Full Picture
The Schedule Gantt View will now default to the full schedule duration instead of the next 90 days. You can also select the 'All' option from the drop down menu (timeframe view).
Skyline Widget - Report By Package
Skyline widgets can now be used to report on individual packages within a given category. This enables you to see the related packages stacked and labeled within the applicable bar!
Basis:
The chart relies on dates that are set when entities enter certain states, that set dates. Below shows how the category is based.
A package must have a date corresponding to the widget settings to appear. For instance, if you are reporting based on package start dates and using the planned dates, you would need a Planned Start Date for your package.
A package is included in "Started" if it is has an Actual Start Date (this is automatically filled out when a package enters a Status with an "In Progress" state).
A package is included in "Complete" if it is has an Actual Finish Date (this is automatically filled out when a package enters a Status with an "Complete" state).
A package is included in "Issued" if it is has an Actual Issued Date (this is automatically filled out when a package enters a Status with an "Issued" state).
A package is included in "With Constraints" if it is not started (Actual Start Date is blank) and has open constraints, and it does not satisfy the conditions of on schedule.
A package is included in "On Schedule" if it is not started (Actual Start Date is blank) and has constraints, but all open constraints have a forecast date before the due date.
A package is listed as "Not issued" if it is constraint free but not does not fall into a later category (i.e. no Actual Finish, Start, or Issued dates).
Schedule Hierarchy
You can now view your schedule in an expandable hierarchy (grid grouping).
O3’s Schedules now have an “Outline View” option to visualize the schedule hierarchy.
You can also expand and collapse groupings.
Fits Like a Glove
O3’s mobile responsive RFI solution for smartphones has been updated with larger buttons for easier use in the field, especially when using gloves!
Reporting Execution
We have introduced a new IWP report table to summarize the execution task types included in the IWP and their steps, and weighting. This can be used as a legend.
Use the Word Report Template - keyword (see table - Alt Text property)
#execution-task-type-steps#
Example:
You Need It When?
RFIs now have a dedicated “Response Required by Date” so you can let them know when you need a response by.
That's Progress
“Drawing Completion Curve” and “Document Completion Curve” dashboard widgets are now available to report on drawing and document completion, even if estimated and earned hours are not provided.
You can toggle on Planned, Forecast and Actual Bars and cumulative curve lines.
Don't Forget the Children!
With a SharePoint/BIM 360 integration, you can now map to the parent folder (to include all sub/child folders), rather than to every individual folder for sync and file processing.
Where: Project Setup - Project Settings - Integrations - Integration Type (from grid - open an entry) and then under Drawings and Document tabs - Child Folder selection.
Execution Task Dates on Task Step Grid
“Execution Task Planned Start Date” is now available on the Execution Tasks Step grid.
What's Your Type?
The “Type” field is now available for User Defined Entity Types - dashboard reporting - Bar Chart Widget.
Example with a User Defined Type called 'FCR'
What's the Holdup!
O3 can now automatically create constraints on IWPs with Documents that have Open RFIs.
A new constraint setting is available to automatically create constraints on IWPs for IWP documents that have open RFIs as predecessors.
Where: Project-Set-Up - Project Settings - Entity Settings - Installation Work Package - General Settings (tab) - Automatically Create Constraints for IWP Drawings and Documents with Open RFIs
Who: System and Project Admins can enable this setting.
For example:
If you have an RFI that is a predecessor to a Document and that Document has successor IWPs - as long as the RFI is open, constraints will be generated (setting switched on) on those successor IWPs, and kept open on the IWPs until the RFI/s are closed (constraints will be automatically closed).
Example Constraint - 'Open RFIs On Package Documents'
Turn on the Power BI
You can now embed Power BI reports within O3 dashboards using the new Power BI widget.
Notes on generating the link to include in your Power BI Widget.
Note: You will need to have a Power BI License and access to the chart to view it.
It's In Development
Development Steps are now available on Design Work Packages (DWPs).
Mobile Punch Lists
A mobile responsive web interface for smartphones is now available for Punch List items.
Just like RFIs, you can add attachments like photos (take/upload option) and other files.
I Know Where I Left It!
Bay, Bank, and Level are now available in the Bill of Materials and Work Package Material Requirements.
Its Late!
Forecast Arrival Date (ETA) and Required at Site Date (RAS date) are now available as fields on the Bill of Materials. These fields can be used at the CWP level to create a constraint for each CWP with material that is Forecast to arrive late against the RAS date.
'Forecast To Arrive Late' column can be used from the Materials grid to easily extract the applicable records.
A 'Materials Forecast To Arrive Late' constraint will be generated if forecasted to arrive late against the RAS date.
Project Setting - Transfers
Its now easier to transfer the Project settings (configuration) both within a deployment and across deployments (such as from Test to Production).
We have added an Export and Import Project Settings options.
The Export will generate a file and then import this elsewhere.
If you already have entries like 'Drawing Types' when you import via 'Import Project Settings', the import file will not replace, but rather merge in new entries.
Where: Project-Set-Up - Project Settings - General
Import / Export Project Settings
Who: System and Project Admins can enable these settings.
You Don't have to Count On the Counter
Entity name masks can now generate without a counter. For example, you may have to have a CWP numbers based on just the CWA number and Discipline. As long as they create a unique name, there should be no problem in adding your new CWP.
O3 will still warn you if you have not included a counter, but its no longer a mandatory requirement!