Make Sure You're Using the Correct Version of O3!
If you don't see version number 25.5 in the bottom-left corner, clear your browser's cache and refresh O3.
Note: references to menu items assume that you are using the 'New Navigation' menu structure.
New Navigation: Please click here for more information.
Table Of Contents
Please use the Table of Content below to jump to a release topic.
Out with the old, in with the new (Purpose)
You can now deactivate Purposes so they cannot be selected, but still maintain the old Purpose on legacy entries.In Scope (Packages)
Documents are now available as a selectable entity type in scope package associations on EWPs.The Big Picture (Plot Plans)
You can now use Plot Plans to filter by an associated entity type, and optionally further filter by the attributes of that selected entity, such as 'Discipline'. You are also able to visualize the package status with a legend in Plan View.It's Significant (TWPs)
Significant Requirements notes are now available to TWPs (Testing Work Packages).Its Automatic
O3 now provides an API function to trigger a BIM360 folder sync.Key Quantity and Bore Size are now available to summarize on main components from sub components during model parsing.
In Search of Something?
O3’s global search has been updated. Results will now appear more quickly and will include other text fields like Long Description!Please Subscribe!
New users will now automatically have subscriptions for project team assignment notifications, without needing to add them manually.
Out with the old, in with the new (Purpose)
You can now deactivate a Purpose so they cannot be selected in the future from drop down selection lists. However, you can still use old (deactivated) Purposes as used on existing entities (such as on a completed/archived IWP).
This might be useful if, for example, you are overhauling the defined purposes for new entries going forward, but need to maintain the old purposes on legacy packages.
By default all new purposes will assume to be Active.
Who: System Admins/Project Admins
Where: From Project Menu - Project Set-up - Project Settings - Entity Settings - entity (e.g. CWP, EWP, IWPs...) - Purposes tab
How: Select an exiting 'Purpose' entry from the grid and open in form layout. On the form you should see a tick box titled 'Is Active'
In Scope (Packages)
You can now add Documents as Scope Packages to your Engineering Work Packages (EWP) entities, with the added 'Document' entity type option (see screen grab below).
Who: System Admins, Project Admins and Users with role permission to add Scope Packages to EWPs.
Where: From Engineering - EWPs - Open an existing entry from grid for form layout - Click on 'Scope Packages' tab
How: To add a new entry click on the '+' symbol at the top right of the Scope Packages grid. Then, from the 'Choose Entity Type' form, you can select 'Document' as the type.
Example EWP entry in form layout view.
After clicking '+' you can select 'Document' as the scope package (entity) type you wish to add.
The Big Picture (Plot Plans)
You can now use Plot Plans to filter by an associated entity type and, optionally, further filter by the attributes of that selected entity, such as 'Discipline'. You are also able to visualize the package status with a legend in Plan View.
For example you may want to just show the CWPs linked, and for those, just the ones that have an 'In Progress' status.
This now provides similar functionality to what is currently available to 3D models, but enables you to generate visualizations at a higher level of detail or where a 3D model might otherwise be too complex for presenting and review meeting purposes.
Who: System Admins, Project Admins and Users with role permission to view and manage plot plans.
Where: Project Menu - *Early Planning - Plot Plans. From grid open a plot plan you wish to use.
* Also from Reporting, Model Management and Project Management menus.
How (1): Assuming you have modified your plot plan and added links to entities such as CWPs in Configuration View, put the plot plan in 'Plan View' first if not already.
Then, if you simply want to filter out the linked shapes to an entity type, click on the 'Association Type: All' button and then select the entity you only want to see, such as CWP or ALL to see all types.
See further down for status visualization and filtering...
Example Plot Plan with multiple entity types linked, such as CWPs, IWPs and Systems.
If editing, switch view to 'Plan View'
Click on the 'Association Type: All' button and then select the entity you only want to see, such as CWP.
In this example, we selected the association as CWP.
The plot plan is now only showing CWPs linked shapes on plot plan.
How (2): To see by status legend and/or filter by Discipline or another entity attribute, change the Display Mode to 'Work Package Status'. Then select 'Legend' (pallet button) on right side.
Status Color Legend: from here you can see the entity (or entities) status legend reflected on the plot plan.
Filters: from the legend form on right, you can also quickly select a Discipline as a quick filter and/or click on the '+' and enter your filter details. For example, you may want to only show where Status is 'In Progress'.
Switch Display Mode to 'Work Package Status'
Click on Legend/pallet button for Legend form on right and Plot Plan now showing the CWP status by legend status key colors.
You can also quickly select a discipline or filter on another attribute of the associated entity selected.
It's Significant (TWPs)
Significant Requirements notes field is now available to TWPs (Testing Work Packages). You could use this to specify any significant requirements that might be required for testing (package) during the pre-commissioning/commissioning phase of the project. Such as they may require temporary equipment (e.g. electrical generators and/or pumps), gas/water supply, special caps and blinds to isolate the inspected equipment or pipe, or might need a particular team involved to support the testing in that area, such as 3rd-party specialized inspection involvement.
It's Automatic
O3 now provides an API function to trigger a BIM360 folder sync.
Who: API calls are normally performed by those with skills in this area, such as those found in your IT/IM department. There will need to be appropriate permissions to perform the calls, an 'API User' will need to be set up within O3 by an O3 system administrator and only be provided certain permissions required to perform the functions required for the API call/s. You can also define which project/s the API User can access and support and multiple API Users can be set-up within the O3 deployment.
Where:
API Documentation: from your O3 user profile button, select API Documentation from the sub menu.
API Users: can be set up from the System Admin - User Admin - API Users menu.
How: Please refer to the API documentation provided for details.
You can get to the API documentation from within the O3 application. Click on Profile and then click on API Documentation option as below.
When the web page opens, at the top of the page is a link for further details on API user set up. To view the specific instruction, scroll down to 'Integrations' heading and below this you should find the [POST] Sync BIM 360 folder instructions. Click on this and it will expand to explain how to use this function.
Roll Up, Roll Up (Sub components)
Key Quantity and Bore Size are now available to summarize on main components from sub components during model parsing.
In Search Of Something?
O3’s global search has been updated. Results will now appear more quickly and will include other text fields like long description.
The O3 Search is located in the middle-top of the O3 application screen.
It can be useful to not only find that IWP or RFI data, but also O3 menu options that have been made available by the O3 Project/System administrators on the project.
Please Subscribe!
New users will now automatically have (notification) subscriptions for project team assignment notifications, without needing to add them manually.
How: To manually add - click on your user Profile button - Notifications - Click on '+' adjacent to the Subscriptions heading. Search or locate e.g. Task Assigned to Project Team / Updated options are required.
To manually add a subscription:
Search for subscription, for example, 'team' and click on the + Task Assigned to Project Team and/or + Task Assigned to Project Team Updated.