Skip to main content

Release Notes 25.2

Released on 22-Jan-2025.

Written by Roy Abery

Make Sure You're Using the Correct Version of O3!

If you don't see version number 25.2 in the bottom-left corner, clear your browser's cache and refresh O3.
​
​Note: references to menu items assumes using the 'New Navigation' menu structure.
To change, select User Profile button in top right and then select Profile. At the top is a toggle to switch to the new navigation (menu structure).
​



​Table Of Contents

Please use the Table of Content below to jump to a release topic.

  1. Its Automatic!
    “Automatically Assign CWP Components.”
    ​

  2. Testing, Testing, 123
    Data deliverable sample results.
    ​

  3. All Systems Go
    Refresh system component associations for system data brought in from 3D model before systems were created in O3.
    ​

  4. The Scrolls
    The Graphical IWP Progressing mode now scrolls to the selected component.
    ​

  5. It's in the Contract
    Contract restrictions are now available for Interface Management.
    ​

  6. You're a Wizard Harry
    Path of Construction wizard.
    ​

  7. It's Pending
    IWPs created from a CWP in Workface Planning tree now show pending CWP data that will be applied.
    ​

  8. The CWP matrix can now be used to break down CWAs by purpose.
    ​

  9. It's Progressing Nicely
    You can now progress Execution Tasks by Component as well as Task Type.
    ​
    ​


Its Automatic!

Users without CWP data in their model can now scope their CWPs automatically by setting up filters for each CWP purpose, and selecting “Automatically Assign CWP Components.”
​
​Where to find - CWP form layout - action menu (vertical ellipses button)
​


​


​


Testing, Testing, 123

​When creating data deliverables, users can now see sample results from the first rows of an uploaded spreadsheet to check their mapping configurations.
​
​How to do:
This example is for Data Deliverables, however this facility is also available to Schedule - Schedule Activity Field Mappings.
​
From the Data Management menu - select Data Deliverables
- Open / create a data deliverable.
​


Upload a sample file - see top right. The available mapping will then be shown.
​

You can then click on the 'Test Configuration' button in bottom left side of the mapping form. Will use the first 3 rows to show the output.
​

O3 will work the mapping and rules applied to provide the example results based on top rows (as below). You can now close. If the rules or mapping not working as expected - you can adjust and retry.
​


All Systems Go

​Users can now refresh system component associations for system data that was brought in from the 3D model before the systems were created in O3.
​
So if you do not see the components on the system as expected - go to the Systems grid and click on the 'Refresh Construction Component Associations' from the Action menu (vertical ellipses button)
​​


The Scrolls

Model - The Graphical IWP Progressing mode now scrolls to the selected component in the model to the same in the Progress panel - meaning its easier to find.


It's in the Contract

​Contract restrictions are now available for Interface Management.

If your project is set-up as Contract and Project Team restricted - this will now apply the same access restrictions to Interface Management entries that have a contract assigned.
To access the user will need to be a member of a Project Team that is allowed to access that Contract.
​


If enabled - 'Interface Management' will be shown under the Project Management menu.


You're a Wizard Harry

​The Path of Construction (POC) menu option now walks the user through the steps of uploading a plot plan, drawing boundaries, linking CWAs, and setting up an initial sequence.
​
​How to do:
Search for 'Path of Construction' at top of screen, or select under 'Early Planning' menu and open the 'Path of Construction'.


From here you will be guided through the steps to create your path of construction...
​


It's Pending

​IWPs created from a CWP in the Workface Planning tree now show the pending CWP data that will be applied (e.g. discipline, contract)
​


The Matrix


​The CWP matrix can now be used to break down CWAs by purpose.
​
​How to do:
Search or locate 'CWP Matrix' at top of screen, or select under 'Early Planning menu' and open the CWP Matrix.
At the top of the screen, adjacent to CWP Matrix (see picture) you can now select Purpose as well as by Discipline. Select per CWA which purpose you wish to create a CWP for and then on the Generate Packages button top right - click on this to auto generate your CWP packages. The tick boxes at top are a convenient way to add that purpose CWP for all CWAs.
​


Its Progressing Nicely

You can now switch between Task Type and Component grouping on the Execution - Execution Tasks Progress grid.



If you need anymore information on these release notes - please contact support@o3.solutions or use the in chat app option.
​
​Back to Top
​
​
​
​
​
​
​
​
​
​
​
​
​

Did this answer your question?